Initial Site-Specific De-Inventory Report for Big Rock Point Report No.: RPT-3014537-002
facility preparation work is completed at this stage. The transport cask Part 71 CoC covers the transport of all the canisters in the state they are at the time of the transport. The timeline of the operations is broken down into 8 campaigns of transport with each campaign being a shipment of one single cask moving in one dedicated train. Each campaign is a round trip shipment for which the major steps are listed in Table 6-4. The estimated duration of a single campaign is 3.5 weeks. The overall duration of the project (for all 8 campaigns) is roughly 6 months, but does not account for delays associated with inclement weather. For the resources estimate, the timeline of the operations can be broken down into 8 round-trip shipments of 5 one-transport casks each over a period of 4 weeks as described in Table 6-4. An additional 4 weeks of preparation is added before the start of the first campaign. The level of detail is the week. TABLE 6-4: OPERATIONS TIMELINE WITH REQUIRED RESOURCES Major steps for the shipment of one canister Resources required (in full-time equivalent (FTE)) Estimated Duration (in weeks) OM COSS TS PW RP TC CO RM EO QS SP 1 Detail planning, preparation 0.5 1 1 1 1 2 1 4 1 1 3
4 weeks prior to start 1 st campaign
of the campaign, mobilization of the equipment, procedure preparation and approval, Systematic Approach to Training (SAT) training program, and staff and dry run(s)
1 week per 1 cask campaign
2 On site transfer of the SNF and GTCC canisters and preparation of the Transport cask 3 Shipment to destination
0.5
1
1 0.5 1 2 1 4 1 1
3
1 week per 1 cask campaign 1 week per 1 cask campaign 1 week per 1 cask campaign
0.5
0.5
1
2
1
4 Unloading
0.5
0.5
1
2
1
5 Return transport of empty casks
0.5
1
1 1 2 1 4 1 1
3
Operations Manager (OM) Cask Operations Shift Supervisor (COSS) Training Specialist (SAT qualified) (TS) Procedure Writers (PW) Radiation Protection Specialist (RP) Transport Coordinator (TC)
Page 6-31
Initial Site-Specific De-Inventory Report for Big Rock Point May 10, 2017