Initial Site-Specific De-Inventory Report for Big Rock Point Report No.: RPT-3014537-002
Health Physics instrumentation calibrated and suited for the types of surveys and measurements required in place Detailed work plans developed that would be used for RWP preparation and ALARA evaluation In addition to the RCTs, workers that are supporting operation have been trained and qualified to the applicable Rad Worker Program requirements. 6.6 Quality Assurance Requirements All quality-affecting activities associated with cask handling operations including transportation would be controlled under a QAP meeting all the governing requirements of Federal, State, and local authorities specific to both the time of activity and the jurisdictions involved. NRC governed activities included under very similar programs specified in 10CFR50, Appendix B; 10CFR71, Subpart H; and 10CFR72 Subpart G will be correlated to ensure all aspects of programs requiring prior approval are appropriately coordinated by the licensed party. One of the additional key pre-mobilization activities will be to ensure that other applicable regulatory regimens or licensee’s basis for commitments are satisfied by the procedures developed under the project program. If any modification, maintenance, or operations/testing activity is specifically governed by Certificate of Conformance holder’s authority, that program will need to be invoked by said Certificate Holder and will normally be transacted via a contract/purchase order issuance specifically calling out such terms and conditions. The FuelSolutions Transportation System components that are important to safety, and any licensed support equipment that is either important to safety or safety-related will require participation of the then-current Certificate Holder for execution. Transportation activity will be controlled per the Special Nuclear Material (SNM) licensee’s QAP including applicable 10CFR71 requirements for transport only to the point of transfer of possession.
Page 6-2
Initial Site-Specific De-Inventory Report for Big Rock Point May 10, 2017
Made with FlippingBook - Online Brochure Maker