Representative Projects Navy Federal Credit Union Phase 2 (FL)

Project involves site development for a new credit union complex in Pensacola which includes demolition and dewatering operations, clearing/grubbing of 20 acres, excavation (15 to 30 feet below structure finish grade) and fill placement, installation of underground utilities, and asphalt paving and curb construction. Arden Site Development (FL) Project involved development of a 1,200 acre mixed use site (residential units, recreational facilities, retail space, and a future public school) which included 3,600,000 CY of material excavation; 50,800 LF of water and sewer pipe installation; and construction of 3 lift stations, a vehicular bridge, and 170,000 SY of roadway infrastructure. Automated People Mover & Intermodal Transportation Facility (FL) Project involved construction of the referenced facility at the Orlando International Airport which included clearing/ grubbing; demolition and dewatering operations; site grading; pond excavation and canal embankment construction; water, sewer, and stormwater drainage line installation; lift station/box culvert construction; and asphalt paving. ESPNWideWorld of Sports Complex Expansion (FL) Project was located within theWalt DisneyWorld Resort and involved expansion of the Hess Sports Fields portion of the complex and associated parking facilities. Project work included clearing/grubbing; construction/upgrade of water detention ponds; grading of athletic fields; and installation of stormwater drainage piping, lift station with force main, and irrigation system. Arrowhead Landfill Construction, Expansion, and Cell Closure (AL) Project involved construction of 5 landfill cells, expansion of 4 existing cells, and partial closure of 4 cells which included +1,400,000 CY of excavation, +3,400,000 SF of polyethylene liner, and +26,000 LF of piping/force main installation. Memphis Regional Intermodal Facility (TN) Project involved construction of 68,950 LF of railroad track; placement of 279,455 SY of roller compacted concrete and 33,317 SY of Portland Cement; construction of 33 high mast light structures, 2 camera portal buildings, and a water booster pump station; and installation of electrical wiring, sanitary sewer, water line, and security fencing. U.S. Route 17 ACE BasinWidening Project (SC) Project involved widening of approximately 10 miles of highway which included earthwork; installation of piping, storm drainage structures, and box culverts; construction of Mechanically Stabilized Earth walls; bridge and roadway construction; and guardrail/median barrier installation. Choctaw Point Complex Mobile Container Terminal (AL) Completed four individual projects associated with the Choctaw Point Complex – Choctaw Point Container Terminal Land Reclamation and Stabilization, Choctaw Point Container Terminal Phase 1B Land Reclamation and Stabilization, Choctaw Point Container Terminal Wetland Mitigation, and Garrows Bend Intermodal Container Transfer Facility Land Reclamation and Diversion Drain. QTG Bottling Plant Site Development (VA & OK) Project involved site development and utility infrastructure installation for an ~ 900,000 SF bottling plant on a 100 acre site in Virginia and an ~1,400,000 SF bottling plant on a 160 acre site in Oklahoma which included 1,345,000 CY of soil and rock excavation and installation of storm drainage, sanitary sewer, and process waste lines. Bellalago Subdivision Site Development (FL) Project involved development of a 1,200 acre residential subdivision site which included 7,770,000 CY of material excavation, 286,000 LF of water and sewer pipe installation, construction of 38,000 LF of sidewalks and 98,000 LF of curbed roadway, and construction of 3 lift stations.

APROVEN INNOVATOR APROVENLEADER APROVENSOLUTION

pandj.com

Made with FlippingBook flipbook maker