S C H OO L B U I L D I N G S
Ta l o t u - a n , C o n c e p c i o n , I l o i l o Repair and rehabilitation of three (3) school building with a total of eight (8) classrooms
4 1 1 elementary students
1 0 0 % completed
1 0 0 % completed 1 0 0 % completed
Repair and rehabilitation of school mini gym and multi-purpose center
Installation of four (4) solar panels
B a n t a y a n , C e b u Construction of school building with two (2) classrooms of approximately 256 sq.ms.
4 8 9 individuals
1 0 0 % completed
1 0 0 % completed 1 0 0 % completed
Construction of computer laboratory approximately 83sq.m.
Installation of water tower and tanks
Provision of computer and computer tables
Intallation of solar panels to power computer lab
P R O V I S I ON O F S C H OO L C H A I R S
Provision of 660 pcs. chairs for the Guiuan National High School G u i u a n , E a s t e r n S a m a r
6 6 0 students
1 0 0 % completed
28
Made with FlippingBook Converter PDF to HTML5