Terms & Conditions of Service Schedule

Simple Structures A Simple Structure includes anchors, posts or poles, and other like structures (not for the purpose of a Fence). Considerations: □ Underground structures should be placed in locations greater than 0.6 metres from Pipelines. □ Notwithstanding anything herein, Simple Structures within the Right of Way or 1.5 metres of the Pipeline where no Right of Way exists may be removed by SaskEnergy at the Grantee or owner’s expense if access is required to construct, inspect, maintain, alter, replace or repair the Pipeline, or if a safety concern arises. □ For site preparation, see Minor Landscaping or Major Landscaping, as applicable. Allowed with Conditions: □ Simple Structures are placed at least 0.3 metres from the Pipeline. □ Simple Structure may be placed with a powered auger or post pounder if the offset is more than 0.6 metres from the Pipeline. □ Mechanical Excavation is allowed within 0.6 metres of the Pipeline, only if the exact pipe location is visually verified by hand digging, or hydro-vac excavation. Mechanical Excavation Directly Over the Pipeline is not permitted. Prohibited: □ Simple structures within 30 centimetres of a Pipeline. □ Rigid connections to other structures (see Fences, Unenclosed Structures, or Enclosed Structures). □ Any Simple Structure not expressly allowed above is prohibited.

All distances are relative to the Pipeline and not the line locate markers (flag, stake or paint) and are deemed accurate if placed within one metre horizontal distance from the Pipeline. www.saskenergy.com/safety/planningyourproject

SaskEnergy Terms and Conditions of Service Schedule – Appendix F

Page 56

Made with FlippingBook Ebook Creator