Terms & Conditions of Service

. . .

Distribution site disturbance 7.1 In the case of pipelines used for the distribution of gas, as defined in section 23 of the Act, no person shall: (a) undertake a site disturbance within the right of way of the pipeline without the consent of the corporation or its subsidiary; (b) where no right of way exists, undertake a site disturbance over or within 1.5 metres of the pipeline without the consent of the corporation or its subsidiary. . . . Hand exposure of pipeline, etc. 7.3 (1) If an operation is to be undertaken by a person involving a ground disturbance within 0.60 metres of an existing pipeline, the person shall ensure that the pipeline is exposed by hand digging or other method approved by the corporation or its subsidiary before mechanical excavation is allowed to commence within that area. (2) If an operation mentioned in subsection (1) exposes a pipeline, the person undertaking that operation shall ensure that the pipeline is supported in order to prevent any damage during backfilling and any subsequent settlement of the ground. (3) If, during the operation mentioned in subsection (1), there is contact with or damage to an underground pipeline, the person undertaking the operation shall immediately notify the corporation or its subsidiary that the contact or damage has occurred.

SaskEnergy Terms and Conditions of Service – Appendix F

Page 66

Made with FlippingBook Ebook Creator