Project Sheet - Flare Tip Replacement

OFFSHORE FLARE TIP REPLACEMENT

Zenith has pioneered the design of a purpose-built lifting frame to simplify the process of replacing flare tips offshore. This innovative solution eliminates the need for expensive barge cranes and helicopters by positioning the lifting frame directly at the flare level. It has been designed to take the weight of the existing flare tip as it is lowered to the deck or supply vessel, as well as lifting the new replacement flare tip into position.

Zenith’s consultants design a variety of lifting frames in addition to the lifting frame featured, dependent on size, weight and flare tower structure configuration.

Click to view Flare Tip Brochure

This design has been adopted by the world’s leading oil and gas companies on offshore platforms and FPSO’s worldwide, showcasing our design capabilities and flare tip replacement service in remote and demanding locations.

Our services include:

• Flare tip replacement without the use of expensive helicopters or barge cranes • Flare tip replacement using Zenith’s purpose-made lifting frame • Rigging studies and temporary works design • Supply and installation of flare tip components, thermocouples, pilot lines, steam lines • Qualified PCN operatives for UT, DPI & MPI inspection works • Qualified site welding capability includes:

BS EN 1090-3: 2019 BS EN 1090-2: 2018 BS EN 1090-1: 2009 and A1:2011

Telephone +44 (0)131 440 3000

Email enquiries@zenithstructural.com

Website zenithstructural.com

FLARE TIP PROJECTS

Project Offshore flare tip replacement

Project Design of temporary lifting davit to replace a flare tip offshore Client Shell FPSO

Project Offshore flare tip replacement

Client AMNI International Petroleum Development Location Nigeria

Client Noble Energy

Location North Sea

Location Equatorial Guinea

Zenith Structural Access Solutions Limited was awarded a contract by AMNI International Petroleum Development Company Limited to design and install a temporary lifting frame. This frame facilitated the replacement of a 907kgs flare tip located on a FPSO offshore in Nigeria. We completed the design, supply, and installation of the temporary lifting frame in-house. Our safe method results in significant cost savings when compared with expensive helicopters and barge cranes.

Shell appointed Zenith to design and install a temporary lifting davit, to facilitate the replacement of a 710 kg flare tip on Shell’s FPSO Curlew located in the North Sea.

The outage work scope included the removal and replacement of the existing flare tip, the flare tip is located on an elevated boom structure. Zenith designed and fabricated a bespoke temporary lifting frame for installation to the existing upper flare derrick to allow the removal of the existing flare tip and the installation of the replacement flare tip (2267 kg).