20250702 HV V1

Operations training

High Voltage Standard / V1 02072025

a. Provide participants with HV cables and various cleat types

b. guiding them through the process of fastening cables securely.

The participants shall:

Take part in a cable fastening practical task:

a. practice securing HV cables using the correct cleats and fastening techniques.

b. recommend appropriate fastening solutions, given different environmental conditions

b.i vibration, temperature fluctuations

ELEMENT 9.2 - INSTALLATION OF THE CABLE LOOP IN TOWER AND WALK DOWN INSPECTION

Learning objectives:

58) Distinguish how to install cable loops in towers (Skills, intermediate level)

59) Perform site cleanup and restore the work area after completing the cable pull (Skills, intermediate level)

The instructor shall:

Installation of the cable loop in tower

a. Illustrate the securing of the cable loop ready for later installation within a tower, emphasising correct handling to avoid mechanical stress

Walk down and inspection of cable after pull

a.

Cleanup and restoration

Explain how to determine if a cable is sufficiently secured, ensuring compliance with work instructions and safety standards.

Inspection Walkthrough:

a. Lead participants through a walk-down inspection post cable installation, highlighting cleanup and cable protection measures.

Global Wind Organisation / www.globalwindsafety.org

103 / 120

Made with FlippingBook Online newsletter maker