Operations training

High Voltage Standard / V1 02072025

a. explain what an electric field is and illustrate why it is important in HV cable pulling

b. show why the handling and placement of HV cable needs to consider electrical fields

The participants shall:

Ask and answer questions on why basic cable theory is relevant to a HV cable pulling operations.

ELEMENT 2.5 - AWARENESS OF HV CABLE TESTING

Learning objectives:

17) Recognise the importance of cable testing after manufacturing and post-pulling before commissioning (Knowledge, basic level)

The instructor shall:

Illustrate the relevance of HV cable testing to cable pulling through an example incident, story from the workplace or a case study

Explain why and when testing occurs

a.

at manufacturing and possibly after cable pulling

b.

before commissioning of HV systems.

Ask participants to suggest what the impact or consequences would be of a failed HV cable test at different stages during preassembly, construction or service.

The participants shall:

Discuss the importance of HV cable testing after manufacturing and post cable pulling, before commissioning

Ask and answer questions on why HV cable testing is relevant to a HV cable pulling operation.

BREAKOUT INSPECTIONS

70 min.