Master on Lab Testing Training Book

6/22/18

Changes

Major changes from2008 to 2012 to 2018 • No minimum probability requirements – manufacturers and ITL required to disclose game math to TGRA • Grandfather period increased to 10 years from November 2008, and now removed and replaced with Audit requirements • Remote access requirements moved to Part 543 • Removed UL and FCC testing requirements • References to entertaining displays removed

New Grandfathering

• Grandfather systems are nowto be called systems manufactured prior toNovember 2008. • Changes still must maintain or improve compliancewith full Class II requirements • 10%of all previous “grandfather” equipment

must be audited annually. May count towards the entire annual floor audit.

2

Made with FlippingBook Annual report