20250702 Solar Technical Training v1

Technical training

Solar Technical Training Standard / V1 02072025

The instructor shall:

Give examples of and explain the difference between:

Inspection e.g. inspecting components

Preparation e.g. gathering tools

Assembly e.g. assembly of main components of the array itself

Explain why inspection, preparation and assembly is performed prior to installation

Explain and demonstrate preparation of parts and tools and particular inspection routines for:

a.

dampeners

b.

torque tubes

c.

motoring gearbox

d.

drive lines

e.

bearings

f.

inverters

g.

cables

h.

combiner boxes

Explain and show why it is important to replace damaged components before installation

The participants shall:

Engage in discussions about different tasks for preparation and installation of solar arrays at the industry work environment

ELEMENT 7.2 - EXAMPLES OF MECHANICAL COMPLETION

Learning objectives:

56) The participants can repeat using a documented checklist required for the mechanical completion of solar array (Skills, basic level)

57) The participants can describe the requirement to take photographs if they see something wrong to help document the problem (Knowledge, basic level)

Global Wind Organisation / www.globalwindsafety.org

38 / 100

Made with FlippingBook Ebook Creator