Technical training
Solar Technical Training Standard / V1 02072025
65) The participants can recognise the importance of inspecting goods and components before being unloaded (Knowledge, basic level)
66) The participants can recognise the importance of notifying a supervisor about any damage found before unloading, and tag “out of service” (or “do not use” or similar) if something is broken while being used (Knowledge, basic level)
67) The participants can perform reception/inspection of goods and components (Skills, intermediate level)
The instructor shall:
Explain the importance and responsibility of inspecting goods and components before being unloaded including:
a.
panels
b.
torque tubes
c.
drive lines
d.
bearings
e. other goods, e.g. solar connectors, combiner boxes, PCS
Explain the importance of notifying a supervisor about any damage found before unloading
a. damage report could be completed by a supervisor to register the damages found
Emphasise the importance of notifying a supervisor and tag “out of service” (or “do not use” or similar) if something is broken while being used.
Demonstrate how to perform inspections in accordance with work instructions, checklists, etc.
Facilitate practice for the participants to perform an inspection and document it on a checklist
Give constructive feedback on the participants’ inspection and documentation of this on a checklist
The participants shall:
Practice and perform an inspection and document it on a checklist (the focus is on the use of the checklist, not on the inspection itself)
Global Wind Organisation / www.globalwindsafety.org
43 / 100
Made with FlippingBook Ebook Creator