Trex® Enhance™ Steel Railing Installation Instructions

HOW TO INSTALL ENHANCE STEEL RAIL HORIZONTAL PANEL/ CONTINUED

Attaching Brackets if using Pressure-Treated Posts with Transcend 6x6 Post Sleeves

4

5

1

Install 1-Piece Skirt and Post Sleeve 1. Slide 1-piece skirt down to rest on decking sur- face. Slide post sleeve over post and position inside post sleeve skirt.

2

3

2" (5.1 cm)

4. C enter lower bracket on post above the marked line and attach using two #10 x 2.5" high carbon steel coated black screws (not provided) . 5. Center upper bracket on post above marked line and attach using two #10 x 2.5" high carbon steel coated black screws (not provided) .

33-1/4" (84.5 cm) or 39-1/4" (99.7 cm)

2. Measure up from top of skirt 2". Mark with light line. 3. M easure up from top of skirt 33 3/4" for 36" rail height or 39 3/4" for 42" rail height. Mark with light line.

KEY Mark Cut

KEY

2

How to Measure and Cut Panel Rails (When REQUIRED)

1

1/4 " (6 mm)

1/4 " (6 mm)

1. P osition panel between posts and ensure there is equal distance on each of the end balusters and posts, as well as allow 1-1/2" on each side of rails to allow for attachment to brackets.

2. U sing a saw with metal blade, cut ends of both bottom and top rails 1/4" shorter on each side to allow for fit into brackets.

3

Have Questions? 1–800–BUY–TREX

NOTE: Construction methods are always improving. Please ensure you have the most up-to-date installation instructions by visiting: trex.com

EHSRHZ-0225

Made with FlippingBook. PDF to flipbook with ease