Oversized & Specialized Pre-Move Planning Toolkit - v1.9

PLAN HOW IT WILL GET ON AND OFF THE TRAILER

Step 3: Define the Loading and Unloading Method A truck arriving at the right place with the wrong loading configuration can quickly become a problem. Determine how the freight will be loaded before transportation is booked.

AT ORIGIN

How will the freight be loaded?

Maximum lifting capacity, if relevant: _____________________________________ Loading appointment required? F Yes F No Special loading instructions: _____________________________________ _ _____________________________________________ _____________________________________ Unloading equipment available onsite: _____________________________________ Delivery appointment required? F Yes F No Special loading instructions: _____________________________________

F Loading dock F Rigging equipment F Loading dock

F Crane F Forklift F Drive-on

F Other: __________________________ Loading can occur from:

F Side F Rear

F Above F Multiple directions

Loading equipment available onsite: _____________________________________

AT DESTINATION

How will the freight be unloaded?

F Loading dock F Rigging equipment F Loading dock

F Crane F Forklift F Drive-on

F Other: __________________________ Unloading can occur from:

F Side F Rear

F Above F Multiple directions

COORDINATION QUESTION

If a crane, rigging crew, installation team or other outside resource is involved: Who is responsible for coordinating it? _____________________________________ Scheduled date/time: _____________________________________ Primary contact: _____________________________________ Phone: _____________________________________ A transport schedule should account for these dependencies, not the truck’s arrival time.