Options Checklist including Wood, Steel and Plam Casework
Wood Options Checklist
TODAY’S DATE:
PROJECT NAME:
DATE QUOTE REQUIRED:
PROJECT LOCATION W/ZIP:
ACTUAL BID DATE: ESTIMATED DELIVERY:
DEALER:
PHASED DELIVERY:
YES NO
SALES CONTACT & PHONE #:
PHASE DETAILS:
ESTIMATING CONTACT & PHONE #:
LIST PRICING REQUIRED:
YES NO
ARCHITECT:
GENERAL All casework will be built based on Diversified Casework specifications and the options selected below. If project specific requirements differ from Diversified Casework’s standard specfication, it is the Dealer’s responsibility to bring those requirements to the attention of Diversified Casework.
STYLE
OVERLAY
SHELF THICKNESS
Majestic
Reveal Overlay - Standard Reveal (1/4”)
3/4”, 1” if Cabinet is 36” wide or greater
Monarch + (Full length wood pulls)
Full Overlay - Tight Reveal (1/16”) - w/full ext. slides
All Shelves 1” +
GRAIN DIRECTION
SHELF EDGE BANDING
Millenium ++ (Inset/Overlay Requires Combination Grain)
EXPOSED VENEER
Vertical Grain Match
Front Edge Only
Red Oak
Combination Grain (Horizontal on Drawers)
Front & Back Edges +
Maple, Select White +
Other:
All Four Edges ++
SEMI-EXPOSED MATERIALS
CABINET BODY MATERIAL
Other:
EXPOSED VENEER GRADE
Mixed species & grade (Standard D3) Same species & cut as exposed ++ (PS)
Veneer Core Plywood
DOOR/DRAWER CORE MATERIAL M2 Particleboard Core Plywood
“A”
“AA” + Other:
Other:
STAIN COLOR
CABINET BACK MATERIAL
EXPOSED VENEER CUT
TBD (To be Determined)
1/4” Hardboard 1/4” Plywood +
Plain Sliced
Northwoods
GLASS IN DOORS
Other:
Coosa
EXPOSED VENEER MATCHING
Golden Tan
3/16” Tempered Glass
Running Match
Pecan
Other:
EXPOSED VENEER SEQUENCING
DOOR/DRAWER EDGE BANDING
Rich Honey
Book - Standard for Red Oak Slip - Standard for Maple
Custom/Color Match
1.5mm rolled hardwood 3mm rolled hardwood 4mm stick hardwood
FINISHED ENDS
Finished Exposed Only
Other:
SPECIAL REQUIREMENTS, ETC.
Finish All +
SEMIEXPOSED FINISH Standard Clear Finish
FSC CoC (SCS-COC-002263) Required +
MAS Certified
Stain to match exposed materials +
ULEF/NAUF Materials (not needed due to MAS cert) Other:
BASE CABINETS
CABINET TOPS
REMOVABLE BACKS
IN-ACTIVE DOOR SECURITY
Full Sub-Top
None
Metal Door Clip
LEVELERS REQUIRED
At cupboard units only
Wood Astragals Millenium ONLY
No
As shown
None if no lock provided
SUB-BASE
OPEN ENDS
Yes +
SECURITY PANELS
Integral Other:
Extended End Panels +
None Yes +
Filler Panels
None (provided by others)
FALSE FRONTS Yes + No
TABLES
TABLES FRAMES ONLY (NO TOPS)
FACTORY INSTALLED TOPS
Yes
Yes
No
No
DRAWERS
DRAWER BODIES
BOTTOM MATERIAL
DRAWER SLIDES
Dovetailed 1/2” Baltic Birch Plywood
1/4” White Faced Hardboard
100# Standard Ext Epoxy Coated
DRAWER BOX HEIGHT
1/4” Birch Plywood +
100# Full Ext Zinc Plated +
Standard
1/2” Material on Drawers greater than 24” wide
100# Full Ext Zinc Plated w/Self-close +
FILE DRAWER SLIDES
Other:
200# Full Ext Zinc Plated N/A Other:
DiversifiedCasework.com | info@DiversifiedCasework.com | 877.348.9663
Wood Options Checklist
HARDWARE
PULLS
DOOR CATCHES
LOCKS
4” Wire 10mm Stainless Steel +
Nylon Double Roller Catch
None
4” Wire 10mm Dull Chrome Epoxy Powder Coated 4” Wire 10mm Gloss Black Epoxy Powder Coated
Magnetic Catch
5 Disc Cam Removable Core
CHAIN STOPS
5 Pin +
4” Wire Satin Aluminum
No
5 Pin Disc Dead Bolt +
Other:
Padlock Hasps if/as shown on drawings
Yes , Location:
KEYING
HINGES
Other:
LOCK LOCATIONS
5 Knuckle Stainless Steel
N/A
5 Knuckle Dull Chrome Epoxy Powder Coated 5 Knuckle Gloss Black Epoxy Powder Coated
Key Locks Alike
N/A
Key Locks Different Key Locks by Room
Drawers Only
Concealed 170 Degree +
Doors Only
SHELF CLIPS
Stamped Keys & Lock Cylinders ++
All Drawers & Doors
MASTER KEYED
Polcarbonate Anti-Tip Twin-Pin
As Shown
LABEL HOLDERS
NUMBER PLATES
No
No
Yes +
None
GRAND MASTER KEYED (5 Pin Locks Only)
Yes
Yes, Location:
SEISMIC RODS
No
Yes +
No
Yes, Location:
BUYOUTS
TOPS
FUME HOODS
ACID & FLAMMABLE CABINETS
None
No
None
1" Black Epoxy With Field Applied Backsplash 1" Black Epoxy With Raised Marine Edge
Yes - Specs Required - DC Sentinel Series
Wood Construction - Match Casework
Other:
Not UL or NFPA certified
FUME HOOD BASE CABINETS
3/4” Black Standard SPC Phenolic
Metal Construction GOGGLE CABINETS
3/4" Black Chemical Resistant SPC Phenolic 1" Black Standard SPC Phenolic - DWI Produced 1" Black Chemical Resistant SPC Phenolic
No
Yes - Wood Cabinet
No
Yes - Metal to match hood
Yes, No Goggles Yes, With Goggles
PEGBOARDS
Color - if other than black:
FIRE BLANKETS
Other:
None
SINKS
Epoxy With Stainless Steel Drip Trough w/hose Phenolic With Stainless Steel Drip Trough w/hose Stainless Steel With Inegral Drip Trough w/hose
No
None
Yes
ROD SOCKETS
Lipped (Drop In) Black Epoxy Sinks with Outlet Undermount Black Epoxy Sinks with Outlet
ELECTRICAL
No
Stainless Steel Sinks
Elec. Fixtures w/cutouts Cutouts ONLY in Cabinets
Yes
FIXTURES
APPARATUS RODS
MISCELLANEOUS
None
No
WaterSaver Polished Chrome Finish
Grommets
Yes (includes uprights, crossbar & clamps)
SAFETY
WaterSaver Vandal Resistant Polished Chrome Finish Sink Jacks
Unimix/Unicast Powder Coated Finish w/washer
Grilles - location:
Showers
Lead Free Fixtures Required
Other:
Eye Washes
Other:
Tempering Valves
PRICING BREAKOUTS
MOCK UP REQUIRED
ENGINEERING REQUIREMENTS To be provided by Diversified
Lump Sum
None
ALL Submittals - Cabinets, Tops, Sinks, Etc.
List Pricing for Contract Sales
Cabinet Only - To options stated above
TRUCK REQUIREMENTS
Cabinet and Top
Cabinets Only in DWG format
Lift Gate Required - Only available on 26" trucks
Elevation/Island Mock up in full
NO Submittals by Diversified - Reviews Only
26" Straight Truck Required
Other:
Dedicated Truck Shipment for all deliveries (no LTL)++ ROOMS TO BE QUOTED: NOTES and/or OTHER REQUIREMENTS:
+/- = cost change over the standard option
08/13/2026
DiversifiedCasework.com | info@DiversifiedCasework.com | 877.348.9663
Steel Options Checklist TODAY’S DATE:
PROJECT NAME:
DATE QUOTE REQUIRED: ACTUAL BID DATE: ESTIMATED DELIVERY:
PROJECT LOCATION W/ZIP:
DEALER:
PHASED DELIVERY: PHASE DETAILS:
YES NO
SALES CONTACT & PHONE #: ESTIMATING CONTACT & PHONE #:
LIST PRICING REQUIRED:
YES NO
ARCHITECT:
GENERAL All casework will be built based on Diversified Casework specifications and the options selected below. If project specific requirements differ from Diversified Casework’s standard specfication, it is the Dealer’s responsibility to bring those requirements to the attention of Diversified Casework. STYLE COLOR SELECTION Inset Single Color Overlay Two-Tone Paint
ACCU TABLES
TABLES FRAMES ONLY (NO TOPS)
FACTORY INSTALLED TOPS
Yes
Yes
No
No
INTEGRA ADAPTABLE BENCHES
By Diverfied Casework
By Others
HARDWARE
PULLS
DRAWER SLIDES
KEYING
N/A
Recessed
Standard Full Extension
Key Locks Alike
Aluminum Bar
Soft Close
LOCKS
Key Locks Different Key Locks by Room LOCK LOCATIONS
Stainless Steel Rod
HINGES
None
5 Knuckle Stainless Steel
5 Disc Cam Removable Core
DOOR CATCHES
MASTER KEYED
N/A
Nylon Double Roller Catch
No
Drawers Only
Yes +
Doors Only All Drawers & Doors As Shown
BUYOUTS
TOPS
FUME HOODS
ACID & FLAMMABLE CABINETS
None
No
None
1" Black Epoxy With Field Applied Backsplash 1" Black Epoxy With Raised Marine Edge
Yes - Specs Required - Sentenil Series Duct System and Blower Not Included
Wood Construction - Match Casework DC standard sizes only due to UL limitations
FUME HOOD BASE CABINETS
3/4” Black Standard SPC Phenolic
Metal Construction GOGGLE CABINETS
3/4" Black Chemical Resistant SPC Phenolic
No
1" Black Standard SPC Phenolic
Yes - Wood Cabinet
No
1" Black Chemical Resistant SPC Phenolic
Yes - Metal to match hood
Yes, No Goggles Yes, With Goggles
PEGBOARDS
Color - if other than black:
FIRE BLANKETS
Other:
None
SINKS
Epoxy With Stainless Steel Drip Trough w/hose Phenolic With Stainless Steel Drip Trough w/hose Stainless Steel With Integral Drip Trough w/hose
No
None
Yes
ROD SOCKETS
Lipped (Drop In) Black Epoxy Sinks with Outlet Undermount Black Epoxy Sinks with Outlet
ELECTRICAL
No
Stainless Steel Sinks
Elec. Fixtures w/cutouts Cutouts ONLY in Cabinets
Yes
FIXTURES
APPARATUS RODS
MISCELLANEOUS
None
No
WaterSaver Polished Chrome Finish
Grommets
Yes (includes uprights, crossbar & clamps)
SAFETY
WaterSaver Vandal Resistant Polished Chrome Finish Sink Jacks
Unimix/Unicast Powder Coated Finish w/washer
Grilles - location
Showers
Lead Free Fixtures Required
Other:
Eye Washes
Other:
Tempering Valves
PRICING BREAKOUTS
MOCK UP REQUIRED
ENGINEERING REQUIREMENTS To be provided by Diversified
Lump Sum
None
ALL Submittals - Cabinets, Tops, Sinks, Etc.
List Pricing for Contract Sales
Cabinet Only - To options stated above
TRUCK REQUIREMENTS
Cabinet and Top
Cabinets Only in DWG format
Lift Gate Required
Elevation/Island Mock up in full
NO Submittals by Diversified - Reviews Only
Straight Truck Required
Other:
Dedicated Truck Shipment for all deliveried (no LTL)++ ROOMS TO BE QUOTED: NOTES and/or OTHER REQUIREMENTS:
DiversifiedCasework.com | info@DiversifiedCasework.com | 877.348.9663
Plam Options Checklist
TODAY’S DATE:
PROJECT NAME:
DATE QUOTE REQUIRED:
PROJECT LOCATION W/ZIP:
ACTUAL BID DATE: ESTIMATED DELIVERY:
DEALER:
PHASED DELIVERY:
YES NO
SALES CONTACT & PHONE #:
PHASE DETAILS:
ESTIMATING CONTACT & PHONE #:
LIST PRICING REQUIRED:
YES NO
ARCHITECT:
GENERAL All casework will be built based on Diversified Casework specifications and the options selected below. If project specific requirements differ from Diversified Casework’s standard specfication, it is the Dealer’s responsibility to bring those requirements to the attention of Diversified Casework.
FACE LAMINATES
SHELF EDGE BANDING
OPEN/GLASS DOOR INTERIORS
TFL - Thermally Fused Laminate HPL - High Pressure Laminate
3mm PVC 2mm PVC
White Cabinet Liner
Matching HPL
CORE
WALL BOTTOMS
SHELF EDGE BANDING
Particle Board
Front Edge Only
Matching HPL Matching TFL
Particle Board with MR at Sinks
Front & Back Edges +
BODY EDGE BANDING
All Four Edges ++
White
SHELF THICKNESS
SPECIAL REQUIREMENTS, ETC. AWI Custom Grade Construction AWI Premium Grade Construction
3mm PVC+ 2mm PVC
3/4", 1" if Cabinet is 36" wide or greater
DOOR/DRAWER EDGE BANDING
All Shelves 1" +
3mm PVC+ 2mm PVC
FSC CoC - Not Available
AWI QCP Labeling - Not Available
BASE CABINET
CABINET TOPS
REMOVEABLE BACKS
IN-ACTIVE DOOR SECURITY Magnetic catch w/5 knuckle hinge
Full Sub-Top Open w/rails
None
At cupboards units only
None if no lock provided
LEVERLERS REQUIRED
OPEN ENDS
As shown
SUB-BASE
No
Filled Panels
Yes +
Separate Applied
SECURITY PANELS
None (provided by others)
FALSE FRONTS
None
All Locked Drawers +
Yes +
All Drawers ++
No
TABLES
TABLES FRAMES ONLY (NO TOPS)
FACTORY INSTALLED TOPS
Yes
Yes
No
No
DRAWERS
DRAWER BODIES
FILE DRAWER SLIDES
DRAWER SLIDES
100# Full Ext Zinc Plated Side Mounted +
100# Full Ext Zinc Plated Side Mounted
1/2" Melamine White
DRAWER BOX HEIGHT
Other:
Other:
Standard
DiversifiedCasework.com | info@DiversifiedCasework.com | 877.348.9663
Plam Options Checklist
HARDWARE
PULLS
DOOR CATCHES
LOCKS
96mm Carbon Steel Wire Pull in Satin Nickel
No Catch (self close hinges)
None
Other:
Magnetic Catch (5 Knuckle hinges only)
Timberline Deadbolt
HINGES
CHAIN STOPS
Disc Tumbler + Pin Tumbler ++
120 Degree Concealed 5 Knuckle Brushed Chrome 5 Knuckle Stainless Steel
No
LOCK LOCATIONS
Yes, Location:
KEYING
N/A
Other:
N/A
Drawer Only Doors Only
SHELF CLIPS
Key Locks Alike Key Locks Different Key Locks by Room
Polycarbonate Anti-Tip Twin-Pin
All Drawers & Doors
Med Pins
As Shown
SEISMIC RODS
NUMBER PLATES (Field Applied)
Stamped Keys & Lock Cylinders ++
MASTER KEYED
None
No
Yes, Location:
Yes, Location:
No
LABEL HOLDERS (Field Applied) No Yes, Location:
Yes +
BUYOUTS
TOPS
FUME HOODS
ACID & FLAMMABLE CABINETS
None
No
None
1" Black Epoxy With Field Applied Backsplash 1" Black Epoxy With Raised Marine Edge
Yes - Specs Required - DC Sentinel Series Duct System and Blower Not Included
Wood Construction - Match Casework DC standard sizes only due to UL limitations
FUME HOOD BASE CABINETS
3/4” Black Standard SPC Phenolic
Metal Construction GOGGLE CABINETS
3/4" Black Chemical Resistant SPC Phenolic
No
1" Black Standard SPC Phenolic
Yes - Wood Cabinet
No
1" Black Chemical Resistant SPC Phenolic
Yes - Metal to match hood
Yes, No Goggles Yes, With Goggles
PEGBOARDS
Color - if other than black:
FIRE BLANKETS
Other:
None
SINKS
Epoxy With Stainless Steel Drip Trough w/hose Phenolic With Stainless Steel Drip Trough w/hose Stainless Steel With Integral Drip Trough w/hose
No
None
Yes
ROD SOCKETS
Lipped (Drop In) Black Epoxy Sinks with Outlet Undermount Black Epoxy Sinks with Outlet
ELECTRICAL
No
Stainless Steel Sinks
Elec. Fixtures w/cutouts Cutouts ONLY in Cabinets
Yes
FIXTURES
APPARATUS RODS
MISCELLANEOUS
None
No
WaterSaver Polished Chrome Finish
Grommets
Yes (includes uprights, crossbar & clamps)
SAFETY
WaterSaver Vandal Resistant Polished Chrome Finish Sink Jacks
Unimix/Unicast Powder Coated Finish w/washer
Grilles - location:
Showers
Lead Free Fixtures Required
Other:
Eye Washes
Other:
Tempering Valves
PRICING BREAKOUTS
MOCK UP REQUIRED
ENGINEERING REQUIREMENTS To be provided by Diversified
Lump Sum
None
ALL Submittals - Cabinets, Tops, Sinks, Etc.
List Pricing for Contract Sales
Cabinet Only - To options stated above
TRUCK REQUIREMENTS
Cabinet and Top
Cabinets Only in DWG format
Lift Gate Required
Elevation/Island Mock up in full
NO Submittals by Diversified - Reviews Only
Straight Truck Required
Other:
Dedicated Truck Shipment for all deliveried (no LTL)++ ARCHITECTURAL SHEETS PROVIDED: ROOMS TO BE QUOTED: NOTES and/or OTHER REQUIREMENTS:
+/- = cost change over the standard option
08/13/2026
DiversifiedCasework.com | info@DiversifiedCasework.com | 877.348.9663
Page 1 Page 2 Page 3 Page 4 Page 5 Page 6Made with FlippingBook interactive PDF creator