P E R F O R M I N G M A I N T E N A N C E
DAILY MAINTENANCE CHECK FOR OPTIMUM PERFORMANCE
Before Starting Work:
1. For field operation: Re-tension wheel nuts after 1st, 5th, then every 50 hrs of operation. 2. For road travel re-tension wheel nuts first 3miles (5kms), 10miles (15kms), and thereafter at 25miles (40kms) intervals. 3. Check for damaged, worn and fatigued parts. Have machine repaired if necessary. 4. Ensure all appropriate safety decals are securely attached to machine, Pgs 13-18. 5. Check all safety mechanisms are in place and operating correctly. 6. Instruction manual has been read, understood and stored with machine.
Starting Work Machine must be: • Lowered to ground. OR, • Placed in raised position with all safety locks engaged and engine shut down before performing any field adjustements, failure to comply could result in serious injury or death. • Set machine on level surface . Run at operating speed and check adjustments: • Tracking in line (if not, check both wing wheel ram taps allow flow to wing cylinder). • Adjust for depth of cut gradually.
28
SG60 SEEDER CROP CADET
OPERATOR & SAFETY MANUAL
Made with FlippingBook - Online Brochure Maker