2945D 2965D Combined 3PL Rigid Speedtiller Operator Manual

F I E L D O P E R AT I O N U S E F U L H I N T S

1. Machine digging too shallow on right hand side • Lower right hand tractor linkage arm. 2. Cross working at 15 degrees off line gives better leveling and trash clearance. 3. Full ground disturbance starts at 2.5 inches. (60 mm) Adjustment should be made to compensate for disc wear and concavity. • To improve weed control and for better soil disturbance • Adjust lateral disc positioning • Ensure machine is traveling in line • Increase depth of cut • Replace discs

Blocking in excessive trash • Lower rear discs gang to drive better in soil. • Adjust angle or lift soil deflector to allow greater flow • Try reducing speed slightly

Clogging in Wet Soils • Raise working depth • Raise front discs • Give soil more time to dry out.

29

2945D - 2965D 3PL SPEEDTILLER

OPERATOR & SAFETY MANUAL

Made with FlippingBook - Online Brochure Maker