GSW Job Book Volume 2

GSW CONSTRUCTION, INC.

VOLUME 2

A HEAVY CIVIL CONTRACTOR PROVIDING SERVICES IN THE GREATER BAY AREA www.gswconstruction.com

GSW CONSTRUCTION, INC.

GSW CONSTRUCTION, INC. IS A LICENSED HEAVY CIVIL CONTRACTOR LOCATED IN SAN FRANCISCO, CALIFORNIA Founded in March of 2021, GSW serves public utility agencies, private utility agencies, and general contractors throughout the greater San Francisco Bay Area. GSW was founded by experienced heavy civil construction professionals, with collective experience of over 40 years. GSW specializes in a wide range of construction projects, from small to large, in both the public and private sectors. GSW’s construction expertise encompasses a range of services, including mass excavations, structural concrete, wet and dry utilities, large-diameter welded steel pipe, water and wastewater facilities, aviation fuel line installation, and distribution. California Contractors License (General A/HAZ) #1085562 San Francisco Micro LBE #CMD01231000511 California Micro Small Business #2026697 ISN Networld #400-437789 Certifications

101 The Embarcadero Suite #123, San Francisco, CA | www.gswconstruction.com

GSW CONSTRUCTION, INC. Safety is our #1 priority!

GSW Construction

www.gswconstruction.com

22-015.8

SLTI ACWC SINKHOLE REPAIR

Inside the temple, water originally from the Pleasanton well fields and Arroyo de la Laguna flowed into a white tiled cistern before plunging into a deeper water channel carrying water from the filter galleries to the Niles Aqueduct in Niles Canyon and across San Francisco Bay near the Dumbarton Bridge.

www.gswconstruction.com

22-015.8

Excavation at Sinkhole

The existing pipe that was installed was creating a sink hole. Over 1100 ft. of pipe was removed.

www.gswconstruction.com

22-015.9

PILARCITOS DAM SIPHON PROJECT

Pilarcitos Reservoir is a primary SFPUC water source for the District and has been since 1949. The Reservoir was originally built in 1866. It is one of the main water supply sources for the city of Half Moon Bay and has to maintain a minimum capacity.

www.gswconstruction.com

22-015.9

www.gswconstruction.com

22-016

Bollman Water Treatment Plant

www.gswconstruction.com

22-016

Process Piping BOLLMAN WATER TREATMENT PLANT CHEMICAL STORAGE IMPROVEMENTS, PHASE 2 AND SEISMIC STRENGTHENING

STRUCTURAL CONCRETE

Temporarily removing sludge collector equipment; demolishing embedded pipe supports and existing chemical tanks. Demolishing concrete supports for existing tanks; removing pipe supports, chemical piping, valves, fittings, control panels, and instrumentation. Remove abandoned pipes and electrical conduits. Constructing concrete beams and columns for launder column bracing. Furnishing and installing safety railings. Repairing and patching concrete walls. Installing seals around existing pipe and conduit penetrations. Reinstalling existing sludge collector equipment Constructing new chemical tank pedestals and anchors. Furnishing and installing chemical piping, fittings, valves, pipe supports, control panels, and instrumentation, and reinstalling existing chemical tanks. Installing trench drains and storm drain pipes. Repurposing existing conduits and conductors. Furnishing and installing new lining and applying exterior coating on existing chemical storage tank. Furnishing and applying chemical resistant coating on existing concrete. Testing, startup, and re-commissioning of existing equipment that a part of the work; and providing training to District staff for new equipment.

www.gswconstruction.com

22-016

Bollman cont.

www.gswconstruction.com

22-016

Chemical Storage Improvements, Phase 2 and Seismic Strengthening

www.gswconstruction.com

22-017

PALO ALTO TWO TURN OUTS City of Palo Alto

www.gswconstruction.com

22-017

CITY OF PALO ALTO

Construct a temporary bypass pipeline in the WSTD vault to connect to the Palo Alto water main. The bypass piping will include a meter set consisting of a strainer, flow meter, swing check valve, and pressure reducing valve in the WSTD vault. Also replace the current 16” steel pipe connection between the vaults with ductile iron pipe according to the terms and plans detailed in CPAU’s plans. Replace a 16” water pipeline and install a 4” bypass at Service Connection #77, within a portion of SFPUC’s Pipeline Right of Way, located at California Avenue, in the City of Palo Alto. CA.

www.gswconstruction.com

23-004

AMAT Duct Bank Cupertino Electric

www.gswconstruction.com

23-004

AMAT Excavation Cupertino Electric

www.gswconstruction.com

23-006

VALLEJO FLOOD & WASTEWATER DISTRICT

NEW BEDFORD SEWER LIFT STATION

www.gswconstruction.com

23-006

Wet Well & Underground Piping

www.gswconstruction.com

23-006

NEW BEDFORD SEWER LIFT STATION CONT.

www.gswconstruction.com

23-006

NEW BEDFORD SEWER LIFT STATION 2023 2025

New Bedford Sewer Lift Station Project-

The work consists of: Construction of a new sanitary sewer lift station. Consists of a new wet well, submersible pumps, electrical and controls building, standby generator, and surge tank for hydraulic transient control.

www.gswconstruction.com

23-010

SFO JET FUEL HYDRANT SYSTEM TRANSFER LINE REPAIRS

BURNS & MCDONNELL

www.gswconstruction.com

23-010

Transfer Line and Hydrant System Repairs

This project consists of extension (to grade) of one low point drain (NLP-6) and a high point vent (OHP-6), decommissioning one fuel vault (FV-14), and installation of a high point vent riser into an existing isolation valve pit (BAB-IVP-50-3). This includes installation of pit components, associated equipment, hydrostatic pit testing, and application of protective coatings.

www.gswconstruction.com

23-011

DUCT BANK EXCAVATION AND INSTALLATION

CUPERTINO ELECTRIC, INC.

www.gswconstruction.com

23-011

Pot Hole- hand dig

www.gswconstruction.com

23-015

EMERGENCY MAYFAIR 6" WATER MAIN REPAIR

City of Daly City

www.gswconstruction.com

23-015

EMERGENCY MAYFAIR 6" WATER MAIN REPAIR Disinfect and install 110’ of new 6” C900 underground piping, valves, and appurtenances. This includes site restoration and A/C to match existing. Disinfect and install new 3ea. new service laterals.

www.gswconstruction.com

23-030

SUNOL VALLEY WATER TREATMENT PLANT GENERATOR FILTER UPGRADE CITY AND COUNTY OF SAN FRANCISCO

www.gswconstruction.com

23-030

FILTER UPGRADE FOR THE CITY & COUNTY OF SAN FRANCISCO

The objective of the project is to remove and replace the Sunol Valley Water Treatment Plant’s Backup Generator Filter and Load Bank, including the provision of a 1MW, 480VAC, 3PH, 60Hz, temporary backup generator during the construction.

Active Diesel Particulate Filter

www.gswconstruction.com

24-018

PIEDMONT PEDESTRIAN BRIDGE

www.gswconstruction.com

24-018

City installs new Piedmont Park pedestrian bridge

www.gswconstruction.com

24-019

UC DAVIS AGRICULTURAL INNOVATION CENTER Sub to Hensel Phelps Construction Co.

www.gswconstruction.com

24-019

UC DAVIS Agricultural Innovation Center

Distribution Piping Backflow Preventers Water Distribution Valves Fire Hydrants Disinfection of Domestic Water Piping Sanitary Sewerage Facilities Strom Drain Utilities

Excavation and Fill Asphalt Concrete Pavement Concrete Pavement Manholes and Structures Utility Line Signs, Markers and Flags Utility Meters Water Distribution Fire Suppression Water

www.gswconstruction.com

24-021

Trash Capture Device Installation on Arf Avenue

City of Hayward

www.gswconstruction.com

24-021

Reinstalling a City owned trash capture CDS Lifting CDS unit in place, cutting into and connecting existing storm drain RCP to CDS units. Crafting a collapsible weir, installing manhole riser, shoring, excavation, and backfilling, bypass pumping and/or groundwater dewatering, construct two new driveways and an AC pad for maintenance trucks, and traffic control.

www.gswconstruction.com

24-024

Ducks Unlimited Fish Screen

SUISUN MARSH WETLANDS

SCOPE OF WORK: Install of 24" HDPE, Fish Screen Replacement, Excavation & rebuild of existing levy.

www.gswconstruction.com

24-024

Install:

24" Smooth Wall HDPE 24" SS Gate Valve 24" Flapgate New Fish Screen

www.gswconstruction.com

24-037

NUNES WTP HYPOCHLORITE ROOM IMPROVEMENTS

www.gswconstruction.com

24-037

Performing concrete repairs, pouring slab, new mechanical piping, and installation of new hypochlorite generator.

www.gswconstruction.com

EMERGENCY PIPE REPAIR JOB

www.gswconstruction.com

www.gswconstruction.com

Our core values are the bedrock of why our company exists and the foundation of how decisions are made in order to achieve our goals and fulfill our company’s vision.

Organizational culture is the collective result of how people on the team think and behave, their shared values and how they react to internal and external stimuli.

CORE VALUES FAMILY SAFETY INTEGRITY RESPECT COLLABORATION INNOVATION

www.gswconstruction.com

www.gswconstruction.com

For more jobs and activities of GSW Construction follow us on social

www.gswconstruction.com

Page 1 Page 2 Page 3 Page 4 Page 5 Page 6 Page 7 Page 8 Page 9 Page 10 Page 11 Page 12 Page 13 Page 14 Page 15 Page 16 Page 17 Page 18 Page 19 Page 20 Page 21 Page 22 Page 23 Page 24 Page 25 Page 26 Page 27 Page 28 Page 29 Page 30 Page 31 Page 32 Page 33 Page 34 Page 35 Page 36 Page 37 Page 38 Page 39 Page 40 Page 41 Page 42

Made with FlippingBook Annual report maker