23-010

Transfer Line and Hydrant System Repairs

This project consists of extension (to grade) of one low point drain (NLP-6) and a high point vent (OHP-6), decommissioning one fuel vault (FV-14), and installation of a high point vent riser into an existing isolation valve pit (BAB-IVP-50-3). This includes installation of pit components, associated equipment, hydrostatic pit testing, and application of protective coatings.