24-021
Reinstalling a City owned trash capture CDS Lifting CDS unit in place, cutting into and connecting existing storm drain RCP to CDS units. Crafting a collapsible weir, installing manhole riser, shoring, excavation, and backfilling, bypass pumping and/or groundwater dewatering, construct two new driveways and an AC pad for maintenance trucks, and traffic control.
www.gswconstruction.com
Made with FlippingBook Annual report maker