Luxe Essentials
EVERYDAY LUXURIES FOR $4,990
Exterior & Garage
LUXE
Application Fee
Development Application and Construction Certificate Fees
Solar System
8 x 475W of Jinko roof top solar panels and 3kW SolaX inverter
Tender Period
Tender price is valid for 12 months from the end of the applicable price period at the time of deposit
Slab
Class 'M' Australian standard engineered slab (as nominated by the engineer)
Construction Insurance
Taps
Garden taps provided to front and rear
Construction insurance premium (home owners warranty)
Facade
Classic facade. Single storey will be in brick, while the double storey is brick and cladding
Maintenance Period
90 day maintenance period
Corinthian Urban PURB 4 entry door in painted finish Corinthian AWOWS 5G 2040mm x 1200mm pivot door in painted or stained finish, with choice of clear or translucent glazing
Pest Control
Pest control certification
Entry Door
Smoke Detectors
Smoke detectors provided (direct wired with battery backup)
Entry Door Handle
600mm pull handle. Selected designs only.
Hot Water System
Electric hot water system
Electrical Safety
Earth leakage electrical safety switch in single phase meter box
22.5 degree roof pitch. May vary on facade detail and for first roof of double storey designs Roof sarking, a protective membrane which maximises energy efficiency while adding extra protection from rough wind and weather events Quality concrete roof tiles in a wide range of profiles and colours from the standard nominated range Powder coated aluminium windows (choice of colours) from the standard nominated range and sliding aluminium doors Keyed locks to external aluminium sliding doors and all opening windows
Electrical
2 x TV and 2 x Cat 6 data points
Roof
BASIX Assessment
BASIX assessment to State Government requirements
Water Tank
3000L slimline water tank
Windows & Sliding Doors
Flooring
Carpet & underlay, hybrid flooring, glazed ceramic tiles from standard nominated range to designated areas
Air Conditioning
Relax in climatised comfort and always feel at home with fully ducted reverse cycle air conditioning
Framing
Clarendon Homes' Hybrid Framing System with both timber and steel and a Lifetime Structural Guarantee. Excludes some areas
Flyscreens
Flyscreens to opening windows
Internal Wet Area Insulation R2.7 Insulation to walls R7.0 Insulation to Ceilings R4.0 Insulation to Floor Joists
Basic scaffolding, void scaffolding and first floor protection, railing and roof scaffolding as per WH&S requirements, subject to site conditions 10.7 certificate Waste Management Plan Erosion and Sediment Control plan Neighbour Notification plan
Insulation
Sectional overhead door for smooth action in a choice of colours from standard nominated range Automatic garage door opener - enjoy the convenience of one unit with cradle-mounted control in garage and two remote controls, as well as a powerpoint which is required for connection
Structural engineering certificate for concrete slab Site contour survey and plan and identification survey Soil test by engineer All weather access control point (standard allowance) Sediment control fencing as required by council Long service levy Trade waste compound as required by council
Mandatory Site Works
Brick veneer plasterboard lined garage Light point to garage as indicated on plan Internal flush panel Corinthian access door to garage with Gainsborough Trade Pro Adel and Bela entrance lever lock set Stepdown included between house and garage Epoxy coating applied to garage floor (plain grey colour)
Garage
Tiling to front porch (from builders nominated range) Tiling to Alfresco (from builders nominated range)
Outdoor Tiling
Security Fencing
Site security fencing as per WH&S requirements
Earthworks
Provide balanced cut and fIll up to 1.0m to achieve a level building platform
Piering
Piering allowance
Concrete
Concrete pump
Water
Water service connection
Water Fees
Water authority fees (regular connections only)
Sewer
Sewer connection to junction within boundary
Stormwater
Provide 100mm stormwater connection to street/easement
Power
Underground power - 3 phase provision included (if required)
*1 Clarendon Homes advises that the NSW State Government has implemented changes to BASIX requirements for all Contracts signed from 1st October 2023. This may affect the BASIX requirements and the way your home is assessed to meet those requirements. Any additional changes required to suit the new Government regulations will be at an additional cost by way of variation. *2 Prices are subject to, Bore Hole, Contour, Bushfire, RTA, Hydraulic Engineers or other Statutory reports as required by your 10.7 certificate, 88B or Site Manager. Up to 8m allowed to the relevant connection point with the exception of acreage designs which have 25m allowed.