Kids Castle Pell City, AL
• 2022 Hybrid Community Build • Budget: $500K
• Size: 12,000 sq ft
• Surfacing: EWF / PIP
• Material: Recycled Plastic / Steel
Kids Kastle was originally community-built in 2001
and served as their central playground until 2022
when our team rebuilt it. For this project, we
utilized community feedback and worked with Pell
City to ensure that all the criteria were met. Our
team prebuilt the majority of the playground in
our facilities so that the park would be completed
and open in time for their community festival. The
playground features EWF with PIP pathways and
has several ADA components.
Made with FlippingBook. PDF to flipbook with ease