Annie’s Playground Fallston, MD
• 2022 Contractor Build • Budget: $1m
• Size: 16,000 sq ft
• Surfacing: Poured in Place Rubber
• Material: Recycled Plastic / Steel
In 2022 / 2023,
our design team and
construction crew designed and rebuilt the old
wooden playground in two phases.
The
playground exceeds accessibility, features a
variety of modern play components, while
maintaining the ”magic” of the original structure.
Made with FlippingBook. PDF to flipbook with ease