Sunshine Playground
Jacksonville Beach, Fl
• 2022 Contractor Build • Budget: $1.6m
• Size: 18,000 sq ft
• Surfacing: Turf
• Material: Recycled Plastic / Steel
• Shaded swings and Sail Shades
PBD was awarded the contract to rebuild
Sunshine Playground after a highly competitive
bid process. The City of Jacksonville Beach, FL
opted for our turnkey services and the
playground was pre-built in both of our
manufacturing facilities and assembled on-site.
The design exceeds ADA accessibility guidelines
and honors the city's history. It features
playground components and park site amenities
from multiple vendors.
This destination
playground opened in the summer of 2022.
Made with FlippingBook. PDF to flipbook with ease