Flow Solutions: The GAP Edge in Water Treatment and Supply

Case Study: Temporary Wastewater Treatment Solution

Location: Mossley, UK Delivered by: GAP Environmental Services Date: December 2024

To maintain compliance during major upgrade works, a major utility company turned to GAP for a rapid modular treatment solution. Installed under tight pre-Christmas deadlines and limited space, the system included four MBBRs and three DAF units. Despite harsh winter conditions, the setup achieved rapid biological activation and consistently reduced ammonia to <1 mg/L. Automated control systems ensured optimised performance and energy use, while DAFs effectively polished the final effluent.

08. Success Stories

From water treatment plants to flood prevention systems, GAP has been at the forefront of tackling some of the UK’s most pressing water challenges. Our modern fleet has supported numerous high- profile projects, delivering outstanding results. One of our most notable successes includes our support during extreme weather events in the North West, where temporary pumping solutions helped safeguard critical infrastructure from large- scale flooding.

Results: • Full compliance maintained

• Rapid installation in restricted site conditions • Outstanding ammonia and BOD reduction GAP’s flexible, high-performance system enabled critical upgrades without breaching discharge consents.

Page 11

Made with FlippingBook Digital Publishing Software