Dynamic Cable Carriers General Catalog

Configuration guidelines | Installation options

Opposite arrangement (schematic diagram)

L G

L W

L S

L S /2

1

3

2

5

6

Cross section of the cable carrier installation

B W B D B k

Abbreviated symbols: B D

1

= clear width in the running link

B G B k

= running link width

= cable carrier width B W = support carriage width (max. width) H = installation height of the cable carrier(s) H G = running link height L G = running link length L S = travel length L W = support carriage length

2

H

4

H G

The cable carrier installation type 225 consists of the following assemblies: 1 Cable carrier(s)

4 Running link 5 Steel cable 6 Cable tensioning roller 7 Tensioning device

with laterally attached track rollers and guide rollers 2 Support carriage with track rollers and guide rollers supporting across the entire length 3 Rolling carriage system with track rollers and guide rollers

89

Made with FlippingBook Digital Proposal Creator