GSW Job Book Volume 1

GSW CONSTRUCTION, INC.

VOLUME 1

A HEAVY CIVIL CONTRACTOR PROVIDING SERVICES IN THE GREATER BAY AREA www.gswconstruction.com

GSW CONSTRUCTION, INC. Safety is our #1 priority!

www.gswconstruction.com

GSW Construction, Inc.

Certifications

California Contractors License (General A/HAZ) #1085562 San Francisco Micro LBE #CMD01231000511 California Micro Small Business #2026697 ISN Networld #400-437789

05

www.gswconstruction.com

GSW CONSTRUCTION, INC.

Founded in March of 2021, GSW serves public utility agencies, private utility agencies, as well as general contractors throughout the greater San Francisco Bay Area. GSW was founded by experienced heavy civil construction professionals, with a collective experience of over 40 years. GSW specializes in small to large construction projects in the public and private sector. GSW’s construction expertise ranges from mass excavations, structural concrete, wet and dry utilities, large diameter welded steel pipe, water and wastewater facilities, aviation fuel line installation and distribution. GSW CONSTRUCTION, INC. IS A LICENSED HEAVY CIVIL CONTRACTOR LOCATED IN SAN FRANCISCO, CALIFORNIA

101 The Embarcadero Suite #123, San Francisco, CA | www.gswconstruction.com

22-015.1.2

CALAVERAS SPILLWAY RETRACTABLE LADDER REPLACEMENT

SAN FRANCISCO PUBLIC UTILITIES COMMISSION

SCOPE OF WORK: Design and fabricate new ladder system. www.gswconstruction.com

22-013

900 INNES SHORELINE REMEDIATION PROJECT POWER ENGINEERING

www.gswconstruction.com

22-013

Construction, Completion and Storm Damage Survey, fabric, and rock install. Excavation occurred during low tide to properly install rock protection and fabric.

Completion Photos: Cobble Revetment

Geotextile fabric was wrapped per detail under cobble.

Storm Damage Photos: Photos of cobble revetment destroyed by erosion from the bay sloughing off parking area above .

www.gswconstruction.com

22-015.3

HARRY TRACY WATER TREATMENT PLANT AMMONIA UPGRADES

HETCH HETCHY REGIONAL WATER SYSTEM SAN FRANCISCO PUBLIC UTILITIES COMMISSION

www.gswconstruction.com

22-015.3

SCOPE OF WORK : Replacing and installing additional aqua ammonia piping support frames for the piping systems to withstand code-level seismic forces. Other work includes installing a redundant 1" aqua ammonia line inside the TWR Chemical Injection/Mixing Vault and modernization of the existing Ozone Generator Power Supply Units.

Aqua Ammonia piping supports Replace or modify existing aqua ammonia piping supports. Transfer pump base work. Phased work to isolate ammonia lines and minimize work hazards. Ozone Generator upgrades Pass through. Installation of PSU, PLC, HMI will be by SFPUC/EMTs. Aqua Ammonia piping work inside the manifold room Replace existing PVC piping with stainless steel. New redundant line within manifold room.

www.gswconstruction.com

Bollman WATER TREATMENT PLANT CHEMICAL STORAGE IMPROVEMENTS

22-016

Temporarily removing sludge collector equipment; demolishing embedded pipe supports. Temporarily removing existing chemical tanks. Demolishing concrete supports for existing tanks; removing pipe supports, chemical piping,

valves, fittings, control panels, and instrumentation. Remove abandoned pipes and electrical conduits.

Dispose of removed materials, equipment, and residual chemicals. Constructing concrete beams and columns for launder column bracing.

Furnishing and installing safety railings. Repairing and patching concrete walls. Installing seals around existing pipe and conduit penetrations. Reinstalling existing sludge collector equipment. Constructing new chemical tank pedestals and anchors. Reinstalling existing chemical tanks. Furnishing and installing chemical piping, fittings, valves, pipe supports, control panels, and instrumentation. Furnishing and applying coating on existing fiberglass control panel enclosures. Installing trench drains and storm drain pipes. Repurposing existing conduits and conductors. Furnishing and installing new lining and applying exterior coating on existing chemical storage tank. Furnishing and applying chemical resistant coating on existing concrete. Testing, startup, and re-commissioning of existing equipment. Training to staff for new equipment.

www.gswconstruction.com

22-016

Chemical Storage Improvements, Phase 2 and Seismic Strengthening

www.gswconstruction.com

HEAVY INDUSTRIAL MECHANICAL PIPING

www.gswconstruction.com

B31.3 Process Piping Valve Replacement Mechanical Equipment Install Tank Farm Modifications and Repairs

www.gswconstruction.com

22-017

PALO ALTO TWO TURN OUTS City of Palo Alto

www.gswconstruction.com

22-017

CITY OF PALO ALTO

Construct a temporary bypass pipeline in the WSTD vault to connect to the Palo Alto water main. The bypass piping will include a meter set consisting of a strainer, flow meter, swing check valve, and pressure reducing valve in the WSTD vault. Also replace the current 16” steel pipe connection between the vaults with ductile iron pipe according to the terms and plans detailed in CPAU’s plans. Replace a 16” water pipeline and install a 4” bypass at Service Connection #77, within a portion of SFPUC’s Pipeline Right of Way, located at California Avenue, in the City of Palo Alto, CA.

www.gswconstruction.com

22-020

ORO LOMA H2S SPONGE PROJECT ORO LOMA SANITARY DISTRICT, ALAMEDA COUNTY

www.gswconstruction.com

22-020

DIGESTER GAS ISOLATION AND PURGING

Relocation and installation of an owner-furnished vacuum tank to be used as an iron sponge for H2S removal. Provide and install all associated valving, piping and supports to connect the tank into the existing digester gas feed and new condensate drainage inlet. Installation of tank filter system including owner- furnished cobbles, mesh and iron media.

Provided all piping; including fittings, valves, supports, and accessories. Interconnect all equipment with piping for complete and operable systems including drains.

www.gswconstruction.com

22-027

DALY CITY EMERGENCY MECHANICAL PIPING AT CITRUS HEIGHTS AVE PUMP STATION

www.gswconstruction.com

22-027

EMERGENCY MECHANICAL PIPING

www.gswconstruction.com

23-002

SAN MATEO TRASH CAPTURE DEVICE

CITY OF SAN MATEO

www.gswconstruction.com

23-002

Poplar at Golf Course Trash Capture Project

The Poplar at Golf Course Trash Capture Project is a part of the City’s plan to achieve compliance with the San Francisco Bay Regional Water Quality Control Board’s (RWQCB) Municipal Regional Stormwater Permit. The permit requires reduction of trash and litter, relative to 2009 baseline values, by 90% by June 20, 2023 and by 100% by June 30, 2025. The Project consists of installing four full-capture screen devices within an existing concrete-lined storm drainage channel adjacent to the Poplar Creek Golf Course.

www.gswconstruction.com

23-004

AMAT Duct Bank Cupertino Electric

www.gswconstruction.com

23-004

AMAT Excavation Cupertino Electric

www.gswconstruction.com

23-005

MOFFETT FIELD USGS RESEARCH FACILITY HENSEL PHELPS

www.gswconstruction.com

23-005

FUEL LINE ABONDONMENT

Mobilization 1 – sampling & analysis Extract and contain sample of pipe contents for testing Haul facilities Mobilization 2 - Pipe remediation Excavate existing Jet A Fuel line. Extract and off-haul all pipe Waste manifests prior to off-haul

Cut, remove, and dispose of riser section Pump line remaining on site full of slurry

Safely abandon an existing fuel line with cementous slurry and remove residual product in pipeline

www.gswconstruction.com

23-006

NEW BEDFORD SEWER LIFT STATION VALLEJO FLOOD & WASTEWATER DISTRICT

www.gswconstruction.com

23-006

Wet Well & Underground Piping

www.gswconstruction.com

23-025

STORM DRAIN SLIDE GATE REHABILITATION PROJECT CITY OF SANTA CLARA PUBLIC WORKS DEPARTMENT

Install a total of three new slide gates for the City of Santa Clara Department of Public Works (SCDPW). Four temporary sewage bypasses to maintain service during inspections removal and installation of the new slide gates. Eastside Pump Station: Replacement of two existing slide gates and frames. Rambo Pump Station: Replacement of one existing slide gate, frames, and new electric motor actuator. Rambo Pump Station: Installation of new electric motor operator. New electrical and mechanical systems will go through testing, start-up, and commissioning. Instrumental Control systems, devices, and instruments. www.gswconstruction.com

23-025

www.gswconstruction.com

23-029

DALY CITY PUMP STATION SHUTDOWN

CITY OF DALY CITY

www.gswconstruction.com

23-029

Effluent Line Repair

Replace all piping Engineer/Design Pipe Remove and Replace flow meter

www.gswconstruction.com

23-015

EMERGENCY PIPE REPAIR JOB

www.gswconstruction.com

23-015

www.gswconstruction.com

CORE VALUES

FAMILY SAFETY INTEGRITY RESPECT COLLABORATION INNOVATION

Our core values are the bedrock of GSW Construction, Inc.

Organization culture is the

collective result of how the people on the team think and behave.

www.gswconstruction.com

www.gswconstruction.com

www.gswconstruction.com