Safety training
GWO Basic Safety Training / V18 2024-06-24
f. to close the platform gate or provide alternative fall protection before disconnecting from the SRL and give the command “CLEAR!” to signal to the deckhand that the SRL is ready to use for the next transferee
g. verify with the deckhand that transfer can commence by giving the command “READY FOR TRANSFER!”, before transfer from WTG to vessel (exit) commences
h. inspects the SRL brake function and fall indicator prior to the transfer from WTG to vessel
i. to connect to the SRL and start the transfer from WTG to vessel immediately
j. to identify the deckhand’s count down during climbing from the 5th ladder rung above the CTV deck “FIVE, FOUR, THREE, TWO, ONE!”
k. upon the deckhand’s command “ONE!”; move one hand to the quick connector’s release function while keeping three points of contact with the ladder, and orientate towards the vessel while stepping across
l. immediately release of the quick connector from the SRL as soon as they touch the vessel with their second foot
Deck hand will hold his hand on the retrieval line of the SRL to keep the device under control
Note
m. immediately climb upwards to a safe position upon the deckhand’s command “ABORT!” during their descent and resume their descent upon the deckhand’s command “READY!” or “DOWN!”
n. application of the above-mentioned principles during transfer without quick connector and with twin fall arrest lanyards
o.
loud and clear communication
Practising the procedures for safe transfer can be conducted from the ground to and from any ladder certified for working at height training
Note
ELEMENT 9.2 - SAFE TRANSFER BETWEEN CREW TRANSFER VESSEL AND WIND TURBINE GENERATOR TRANSITION PIECE
Learning objective:
56) The participants can take responsibility for conducting safe transfer between vessel and WTG applying lanyards and connectors (Ability, intermediate level)
Global Wind Organisation ©2024/ www.globalwindsafety.org
244 / 301
Made with FlippingBook - Online catalogs