Safety training
GWO Basic Safety Training / V19 02052025
54) Take responsibility for conducting safe transfer for themselves between CTV and WTG TP (Ability, intermediate level)
ELEMENT 9.1 - PROCEDURES FOR TRANSFER BETWEEN CREW TRANSFER VESSEL AND WIND TURBINE GENERATOR TRANISITON PIECE
Learning objective:
55) The participants can take responsibility for performing buddy checks of tethering systems on colleagues prior to transfer (Ability, intermediate)
56) The participants can perform transfer between CTV and WTG TP following the relevant procedures (Ability, intermediate level)
The instructor shall:
Explain and demonstrate the procedure for safe transfer between CTV and WTG TP and for the return transfer to CTV
Supervise participants’ pre-use inspection of PPE (quick connector included) prior to commencing transfer process
Assess and ensure that all participants conduct buddy checks each time PPE is worn and that all carried items are safely tethered (e.g. tablets, mobile phones, radios)
Provide feedback to the participants on their initiative and their buddy checking
Conduct practical training of the procedure while focusing on safety and procedural commands
The participants shall:
Conduct pre-use inspection of PPE (quick connector included) prior to commencing transfer process
On their own initiative, perform buddy checks in relation to safe tethering of additional equipment (e.g. tablets, mobile phones, radios)
Practise the procedure for safe transfer between CTV and WTG TP and for the return transfer to CTV:
a. advance from the designated transfer waiting area to the transfer position upon the command “ADVANCE!” from the deckhand
b.
to prepare their quick connector
Global Wind Organisation ©2025/ www.globalwindsafety.org
253 / 312
Made with FlippingBook - Online catalogs