2023-05-02_SLS_V4

Operations training

Slinger Signaller Standard / V4 2023-05-02

Always coordinate communication with crane driver during toolbox-talks

Note

Crane Action

Verbal Instruction Pictogram OSHA

Description

Pictogram BS 712

Stop

Stop

Arm extended, palm down, move arm back and forth horizontally.

Emergency stop

Stop

Both arms extended, palms down, move arms back and forth horizontally.

Raise the load

Raise or Hoist

With forearm vertical, fore finger pointing up, move hand in small horizontal circle.

Global Wind Organisation©2023 / www.globalwindsafety.org

44 / 73

Made with FlippingBook Annual report maker