2023-05-02_SLS_V4

Operations training

Slinger Signaller Standard / V4 2023-05-02

ANNEX 2 - EXAMPLES OF SAMPLE LIFT PLANS This annex presents two sample lift plans: 1. Lift plan for a simple lift of a generator off a CTV 2. Template for a lift plan on a lift and positioning on a shipping container

The lift plans in this annex are not intended to be used as live lift plans. They are only to be used as a template for the training provider to create their own lift plan during training. They can be used as an example during the training to show the specific elements that are included in a lift plan. The details regarding the crane selection and load characteristics do not imply a requirement for the training.

Note

Note

Basic Lifting Plan Wind Jackup @ Windfarm 1

Basic Lifting Operation For basic lifting operations, the planning of each individual lift is the responsibility of the person using the lifting equipment. The Lift Controller (LC), in charge of the operation, should possess the necessary knowledge, training and experience to be able to carry out the planning, execution and completion of the task in a safe and efficient manner. A simple lifting plan follows: Follow the checklist and complete the lift. If you cannot answer yes to all of the checks noted below consult your Lift Controller (LC) before attempting the lifting operation. ACTIONS YES NO 1) Assess the weight of the load. 2) Choose the correct lifting tackle for the job. 3) Ensure that the load will not pass directly over other workers. 4) Check the path of the load to ensure that there are no obstructions. 5) Ensure that the end position of the load is able to receive the load. 6) Attach the lifting tackle to the load using the correct slinging method. 7) Carry out a trial lift to ensure that the load hangs securely as intended. 8) If required, fit taglines to stop the load from swinging. 9) Warn workers in the load path that the operation is about to begin. 10) The weather is within limits for lifting operation.

11) Land the load and release the slings using bearers to release (if required). 12) Release the crane for other users and clear up all of the gear used.

Global Wind Organisation©2023 / www.globalwindsafety.org

48 / 73