2023-05-02_SLS_V4

Operations training

Slinger Signaller Standard / V4 2023-05-02

Table of contents for sample lifting plan

1

Introduction

X

2

Arrival on site

X

3

Item to be lifted

X

4

Crane details

X

5

Lifting accessories

X

6

Safe working load

X

7

Lifting operation

X

8

Drawings

X

9

List of appendices (to sample lifting plan)

X

10

Competent person contact detail

X

1. Introduction This method statement has been prepared and based on the information supplied by our client together with site inspection. Risk assessment and drawings completed by the competent person. All work shall be performed in accordance with: 1. The Management of Health and Safety at Work Regulations 1999 Reg. 3. 2. Health & Safety at Work Act 1974 3. BS 7121 Safe Use of Cranes and Lifting Operations Parts 1 and 3 4. Lifting Operations and Lifting Equipment Regulations 1998 5. The Provision and Use of Work Equipment Regulations 1998 Reg. 3 to 11

The above legislation is applicable to the UK. Local/national legislation shall be adhered to in countries where the above is not applicable

Note

TBT m/s RCI

Toolbox Talk

Meters Per Second (Wind Speed)

Rated Capacity Indicator

Global Wind Organisation©2023 / www.globalwindsafety.org