Operations training
Slinger Signaller Standard / V4 2023-05-02
CoG WLL ABS EWL
Centre of Gravity Working Load Limit Alloy Bow Shackle
Effective Working Length
Table Annex 2.2.1 Abbreviations used in Sample Lift Plan
2. Arrival on site Before any work, including the rigging of cranes commences, any induction necessary will be carried out by site personnel. During this, all known hazards will be identified, and the evacuation routes and procedures advised. The crane supervisor will hold a TBT with the crane operator, slinger signallers and all other personnel involved with the lifting operation. During the TBT the crane supervisor will communicate the work to be executed in the method statement and identified roles of the main personnel and their responsibilities. The content of risk assessments associated with this method statement must also be discussed. Once inductions and TBT have taken place the crane shall be set up in position shown on drawing CNTR- SMP-DWG-01 in accordance with manufacturer’s instructions. 3. Items to be lifted Shipping Container 12.0 m x 2.5 m x 2.3 m high. Weight: 10.0 metric tons 4. Crane details Type Liebherr LTM 1095-5.1 Capacity 95 metric tons Counterweight 23 metric tons Main Boom Length 29.2 m Outrigger Centres 7.3 m x 7.0 m Hook Block Capacity 16.0 metric tons Max. Working Wind Speed 11 m/s (10-minute mean)
5. Lifting accessories QTY.
ACCESSORY
WLL
4
Container lifting lugs
32.0 metric tons
Global Wind Organisation©2023 / www.globalwindsafety.org
53 / 73
Made with FlippingBook Annual report maker