2023-05-02_SLS_V4

Operations training

Slinger Signaller Standard / V4 2023-05-02

Lift items table Item Description

Drawing id no.

Item Weight

CNTR-SMP-DWG-01 a & b

Drawing showing crane position and information

10.00 metric tons

CNTR-SMP-DWG-02 a & b 10.00 metric tons See drawing pairs below, after section 10. The pairs may be reassembled before use to create two A3 complete diagrams 9. List of appendices (to sample lifting plan) List of appendices relating to the lifting operations. Appendix 1_ CNTR-SMP-RA-01 Lifting RA Appendix 2_ CNTR-SMP-DWG-01 & 01A (associated drawings) Container rigging drawing

Where documents and drawings are referenced, the user must always check that the latest revisions are used in relation to this lift plan. If in doubt, contact the responsible person.

Note

10. Competent person contact details In the event that there is a requirement to contact the competent person for lifting operations they may be contacted using the mail address and phone number below.

Mail- xxxxx Tel- xxxxxx

Global Wind Organisation©2023 / www.globalwindsafety.org

56 / 73

Made with FlippingBook Annual report maker