Safety training
Basic Safety Training Online Partial Refresher / V3 2023-05-02
The participants shall:
Engage in the discussion and share understandings about the importance of pre-use inspection of PPE prior to transfer Engage in answering the questions and share understandings about how to perform a pre-use inspection of PPE for working at height and transfer including quick connectors LESSON 8 - INSTALLATIONS, VESSELS AND WTGS
15 min.
The aim of this lesson is to enable the participants to act safely onboard installations, vessels and wind turbines during normal operations and in case of emergencies and evacuation through understanding the importance and locations of contingency plans.
After successfully having completed this lesson, participants can:
66) Show interest in the importance of general safety on board and where contingency plans on installations, vessels and wind turbines are typically located (Ability, basic level)
ELEMENT 8.1 - SAFETY ON BOARD
Learning objectives:
67) The participants can explain the importance of general safety on board (Knowledge, basic level)
68) The participants can describe how failing to adhere to general safety on board installations, vessels and WTGs can lead sea survival situations (Knowledge, basic level)
The instructor shall:
Explain general safety on board installations, vessels and WTGs
Lead a discussion about how failing to adhere to general safety on board installations, vessels and WTGs can lead sea survival situations
The participants shall:
Engage in the discussion and share understandings about how failing to adhere to general safety on board installations, vessels and WTGs can lead sea survival situations
Global Wind Organisation ©2023 / www.globalwindsafety.org
122 / 151
Made with FlippingBook. PDF to flipbook with ease