Technical training
Basic Technical Training / V8 2023-05-02
1.7
Human factors TOTAL
30 min.
2.
Introduction to Installation
2.1 2.2 2.3 2.4 2.5
Installation overview Why installation safety?
Safety signs Types of PPE
The importance of appropriate isolation TOTAL
55 min.
3.
General procedures for working onsite with installation
3.1 3.2
Checklists, work instructions, etc.
Housekeeping TOTAL
30 min.
4.
Installation environments
4.1
Installation environments TOTAL
45 min.
5.
Handling and storing
5.1
Risks and hazards associated with handling and storing
5.2 5.3
Reception/Inspection
Unloaded and storage of blades, nacelle, tower sections and hub
5.4 5.5
Tools and equipment
Return of goods and components TOTAL
70 min.
6.
Lifting operations
6.1 6.2 6.3
Post-use inspection
Risks and hazards associated with lifting operations
Roles and responsibilities TOTAL
100 min.
7.
Main component preparation, pre-assembly and assembly
7.1 7.2
Preparation, pre-assembly and assembly
Risks and hazards associated with main component preparation, pre-assembly and assembly Challenges when assembling the main components TOTAL Introduction to mechanical completion Examples of mechanical completion Risks and hazards associated with mechanical completion TOTAL
7.3
50 min.
8.
Principles of mechanical completion
8.1 8.2 8.3
75 min.
Global Wind Organisation / www.globalwindsafety.org
176 / 262