2024-06-24_BTT_V9

Technical training

Basic Technical Training Standard / V9 2024-06-24

1.4

Aims and objectives

1.5

Ongoing assessment

1.6

Motivation

1.7

Human factors TOTAL

30 min.

2. Introduction to Installation

2.1

Installation overview

2.2

Why installation safety?

2.3

Safety signs

2.4

Types of PPE

2.5

The importance of appropriate isolation TOTAL

55 min.

3. General procedures for working onsite with installation

3.1

Checklists, work instructions, etc.

3.2

Housekeeping

TOTAL

30 min.

4.

Installation environments

4.1

Installation environments TOTAL

45 min.

Risks and hazards associated with handling and storing

5. Handling and storing

5.1

5.2

Reception/Inspection

Unloaded and storage of blades, nacelle, tower sections and hub

5.3

5.4

Tools and equipment

5.5

Return of goods and components TOTAL

70 min.

6. Lifting operations

6.1

Post-use inspection

Risks and hazards associated with lifting operations

6.2

6.3

Roles and responsibilities TOTAL

100 min.

7. Main component

7.1

Preparation, pre-assembly and assembly

preparation, pre-assembly and assembly

Risks and hazards associated with main component preparation, pre-assembly and assembly Challenges when assembling the main components

7.2

7.3

Global Wind Organisation / www.globalwindsafety.org

179 / 269