Technical training
Basic Technical Training Standard / V9 2024-06-24
1.4
Aims and objectives
1.5
Ongoing assessment
1.6
Motivation
1.7
Human factors TOTAL
30 min.
2. Introduction to Installation
2.1
Installation overview
2.2
Why installation safety?
2.3
Safety signs
2.4
Types of PPE
2.5
The importance of appropriate isolation TOTAL
55 min.
3. General procedures for working onsite with installation
3.1
Checklists, work instructions, etc.
3.2
Housekeeping
TOTAL
30 min.
4.
Installation environments
4.1
Installation environments TOTAL
45 min.
Risks and hazards associated with handling and storing
5. Handling and storing
5.1
5.2
Reception/Inspection
Unloaded and storage of blades, nacelle, tower sections and hub
5.3
5.4
Tools and equipment
5.5
Return of goods and components TOTAL
70 min.
6. Lifting operations
6.1
Post-use inspection
Risks and hazards associated with lifting operations
6.2
6.3
Roles and responsibilities TOTAL
100 min.
7. Main component
7.1
Preparation, pre-assembly and assembly
preparation, pre-assembly and assembly
Risks and hazards associated with main component preparation, pre-assembly and assembly Challenges when assembling the main components
7.2
7.3
Global Wind Organisation / www.globalwindsafety.org