2023-05-02_BTT_V8

Technical training

Basic Technical Training / V8 2023-05-02

e.

Preparation

f.

Pre-assembly

g.

Lifting / assembly

h.

Tightening

i.

Cable work

j.

Finishing (Mechanical, Hydraulic and Electrical)

Ask the participants relevant questions about the main activities required for the installation of turbines

The participants shall:

Describe in their own words and share understandings about the main activities required for the installation of turbines

ELEMENT 2.2 - WHY INSTALLATION SAFETY

Learning objectives:

14) The participants can describe how to identify known and suspected hazards involved in the installation of turbines (Knowledge, basic level) 15) The participants can describe the health risks associated with the hazardous situations (Knowledge, basic level) 16) The participants can describe the means to reduce the exposure to acceptable levels (Knowledge, basic level)

17) The participants can discuss the importance of installation safety (Knowledge, intermediate level level)

The instructor shall:

Explain how to identify known and suspected hazards involved in the installation of turbines. This will include:

a. All sources of hazardous situations, e.g. electricity, dropped objects, crushing damage, sharp items, toxic materials and/or substances used in the workplace

b. Tools/equipment malfunctioning due to poor control and/or handling during installation.

Global Wind Organisation / www.globalwindsafety.org

183 / 262

Made with FlippingBook Digital Proposal Creator