Technical training
Basic Technical Training / V8 2023-05-02
The participants shall:
Engage in a group discussion on examples of the risks and hazards associated with handling and storing.
ELEMENT 5.2 - RECEPTION/INSPECTION
Learning objectives:
30) The participants can recognise the importance of inspecting goods and components before being unloaded (Knowledge, basic level) 31) The participants can recognise the importance of notifying a supervisor about any damage found before unloading, and tag “out of service” (or “do not use” or similar) if something is broken while being used (Knowledge, basic level)
32) The participants can perform reception/inspection of goods and components (Skills, intermediate level)
The instructor shall:
Explain the importance of inspecting goods and components before being unloaded (responsibility):
a.
Inspection
b.
Nacelle
c.
Tower sections
d.
Blades
e.
Hubs
f.
Other goods, e.g. tower bolts…
g. If any damage is found, the supervisor should be notified (a damage report could be completed by a supervisor to register the damages found)
Explain the importance of notifying a supervisor about any damage found before unloading
Emphasize the importance of notifying a supervisor and tag “out of service” (or “do not use” or similar) if something is broken while being used.
Demonstrate how to perform inspections in accordance with work instructions, checklists, etc.
Facilitate practice for the participants to perform an inspection and document it on a checklist
Global Wind Organisation / www.globalwindsafety.org
190 / 262
Made with FlippingBook Digital Proposal Creator