2024-06-24_BTT_V9

Technical training

Basic Technical Training Standard / V9 2024-06-24

Describe the difference between onshore and offshore approaches to preparation and pre- installation of main components

Facilitate discussions about different tasks for preparation, pre-installation and installation of WTG at onshore and offshore sites.

The participants shall:

Engage in discussions about different tasks for preparation, pre-installation and installation of WTG at on-shore and off-shore sites.

ELEMENT 7.2 - RISKS AND HAZARDS ASSOCIATED WITH MAIN COMPONENT PREPARATION, PRE-ASSEMBLY AND ASSEMBLY

Learning objective:

63) The participants can explain the risks and hazards associated with main component preparation, pre-assembly and assembly (Knowledge, intermediate level)

The instructor shall:

Explain the risks and hazards associated with:

a.

Main component preparation

b.

Pre-assembly of components

c.

Assembly of components

d.

Cleaning.

Present examples from installation sites with relevant risks and hazards associated with main component preparation, pre-assembly and assembly (e.g. pictures, videos, a case or scenarios)

Divide the participants into small groups

Ask the participant groups to analyse the examples with the following aims:

a.

Find the relevant risks and hazards

b. Explain in their own words and share understandings about how the risk and hazards can be mitigated

Global Wind Organisation / www.globalwindsafety.org

202 / 269