Technical training
Basic Technical Training Standard / V9 2024-06-24
a.
Mounting of ferrules
b.
Mounting in clamp and screw terminals
c.
Shield termination types
Demonstrate how to perform termination on main power cables (copper/aluminium):
a.
Mounting of cable lugs on busbar (correct torque)
b.
Mounting of cable to connectors (correct torque)
Facilitate discussions about typical faults during termination
Facilitate practice for the participants to mark, route and terminate all cable types
Give constructive feedback on the participants’ marking, routing and termination of all cable types
The participants shall:
Engage in discussions about typical faults during termination:
a.
Insulation in terminal & loose cores
b.
In correct torque – generates heat
c.
Poor crimping – all kinds of scenarios
Practice mounting markings in accordance with an electrical diagram:
a.
Cable and conductor
b.
Cabinet (diagram)
Practice routing all cable types applying these factors:
a.
Bending radius
b.
Distance between cable types and groups
c.
Fastening of cables: fixed vs flexible
d.
Cable protection tubes or edge protection
e.
Cable glands
Practice routing fibre optic cables
Practice correctly terminating signal cables: