Technical training
Basic Technical Training Standard / V9 2024-06-24
This is a fictive generic work instruction intended for training purposes and therefore may vary from the work instructions provided by a company. It is important that a technician always read work instructions carefully prior to any bolt torquing task.
Note
3. GWO Work Instructions for Bolt Torquing (For Training Purposes Only)
Work Instruction:
Document No.: GWO 123456
Bolt Torquing Scenario
Prepared by: John Doe Reviewed By: Jane Doe Released by: GWO training simulation
Site: Generic Wind Turbine Generator
Version: 2.0
Exemption Certificate No. (ENC): 123456
Turbine Serial Number: 654321
Checklist: GWO Post-Job Checklist
Date: 01-01-2023
Task Description 1. Conduct a briefing and fill-out the relevant parts of the PDR and job checklist
2. Following the procedures and specifications described in the GWO Bolt Torquing Manual, each participant shall use: i) electrical torquing tools to first complete 1-stage tightening of at least three M36 bolts, each bolt requiring a different torque value. ii) hydraulic torquing tools to complete 2-stage tightening of at least two M36 bolts, each bolt requiring a different torque value.
3. Complete the PDR and job checklist
4. Loosen the bolts using either electric or hydraulic torquing tools. Making sure to check that the bolt is actually tightened prior to loosening.
Global Wind Organisation / www.globalwindsafety.org
233 / 269
Made with FlippingBook Digital Proposal Creator