2024-06-24_BTT_V9

Technical training

Basic Technical Training Standard / V9 2024-06-24

This is a fictive generic work instruction intended for training purposes and therefore may vary from the work instructions provided by a company. It is important that a technician always read work instructions carefully prior to any bolt tensioning task.

Note

3. GWO Work Instructions for Bolt Tensioning (For Training Purposes Only)

Work Instruction:

Document No.: GWO 987654

Bolt Tensioning Scenario

Prepared by: John Doe Reviewed By: Jane Doe Released by: GWO training simulation

Site: Generic Wind Turbine Generator

Version: 2.0

Exemption Certificate No. (ENC): 456789

Turbine Serial Number: 987654

Checklist: GWO Job Checklist

Date: 01-01-2023

Task Description 1. Conduct a briefing and fill-out the relevant parts of the PDR and job checklist

2. Following the procedures and specifications described in the GWO Tensioning Manual, use hydraulic tensioning tools to complete 2-stage tensioning of at least two M36 bolts, each bolt requiring a different tension value.

3. Complete the PDR and job checklist

4. Loosen the bolts using hydraulic tensioning tools. Making sure to check that the bolt is actually tightened prior to loosening.

Global Wind Organisation / www.globalwindsafety.org

248 / 269

Made with FlippingBook Digital Proposal Creator