Safety training
Basic Safety Refresher Training / V13 2024-06-24
8.6 Delegate performance assessment form
Renamed from Control measures.
•
• Changed terminology from control measures form to delegate assessment form.
9.2, 12.2 & 13.2 Duration of the xx module
• Reworded to clarify the concepts of contact time and total training day
• Inserted table x-2 with maximum allowed contact time per day and total training day
9.3, 12.3 & 13.3 xx module trainer / delegate ratio
Table format adjusted and standardised
•
9.4, 12.4 & 13.4 Equipment for xx module
Moved to Annex 3
•
9.5, 12.5 & 13.5 xx module timetables
Table format adjusted and standardised
•
9.6, 12.6 & 13.6 Detailed description of the xx module
• Paragraph styles aligned throughout the lessons, elements & notes.
• Bullets removed and replaced with numbering throughout.
9.1 Aims and objectives of the BSTR First Aid module
Aims updated to include CPR and AED
•
9.6 Detailed description of the BSTR First Aid module
Minor spelling corrections throughout.
•
12.1 Aims and objectives of the BSTR Working at heights module
• Aims updated in line with work done on combined module
12.3 Working at heights Instructor to delegate ratio
• Practical exercise ratio increased from 1:4 to 1:6.
The ratio remains at 1:4 for onsite training.
•
12.4 Equipment for Working at heights module
Equipment list moved to Annex 3.
•
• Inserted explanation of a generic approach to training
Global Wind Organisation ©2024 / www.globalwindsafety.org
128 / 135
Made with FlippingBook - professional solution for displaying marketing and sales documents online