Long term service agreement Prony Resources, New Caledonia

• In 2010, ABB delivered a site-wide 800xA control system and continued to support with expansion projects and a service agreement. • In 2021/2022, ABB delivered a controls upgrade for Boiler #4 and the customer expressed interest in a nearly identical upgrade to Boiler #5. • 800xA control system integration for new boiler #5. Includes functional safety design. Supply of hardware in panels and associated engineering, programming and site commissioning.

Opportunity

Description

New control system

ABB solution

Hardware and licences

• Supply of safety engineering, programming and commissioning

• Service excellence and experience with Boiler #4 • We collaborated transparently with the customer to demonstrate the need for engineering was justified due to detailed safety design and ABB expertise of the site control system and even offered at time and materials for opportunity for engineering costs to come down if ABB overestimated.

Why ABB?

Slide 18

August 2, 2023

Made with FlippingBook interactive PDF creator