Newcrest, Cadia East Underground Expansion

• Complete electrical and automation system for six underground inclined conveyors with a total length 8.8km, total lift of 1.4km and an installed power of 26.7MW

Customer needs

• Designed, engineered and supplied full Electrical and Automation solution consisting of:

7 x 33kV Ring Main Units

5 x 8MVA Transformers

ABB solution

10 x Transportable Switchrooms

➢ 5 x Water Cooled ACS 6000 Multidrives with Mining Conveyor Control Program

5 x Water Cooled Brake Resistors

5 x Low Voltage MCCs and UPS

10 x Water Chillers

19 x 3.3kV Induction Motors

• State-of-the-art conveyor control system that optimises the overall performance, reliability, energy efficiency and operational flexibility of the conveyor system over its lifetime.

Customer value