Karara Mining, Geraldton

• Analysis of the Drives Preventive Maintenance Schedule and considering the installation date of the drives and upgrades required. • During the negotiation stage, an opportunity for a spare TX for the HPGR was found because of the analysis of the spares done. • 4 x ACS1000 Drives at Karara Mining were installed in 2013. According to the PM schedule for those Drives, they are due for a 10 Years Preventive Maintenance in 2023. • In 2017,we were informed that the Main Board INT2 of these drives were at the end of their lifecycle, therefore, an upgrade for the control board was available .

Opportunity

Description

• Conduct preventative maintenance and firmware upgrades on ABB ACS1000 drive systems on the High-Pressure Grinding Rolls at Karara Mine, plus 1xHPGR Spare Transformer.

ABB solution

Slide 21

August 2, 2023