South County Integrated Mobility Study

Capital Improvements Program (FY18-FY23)

The Capital Improvements Program (CIP) lays out the county’s budget for projects over a six-year period. To accomplish the County’s mission for high quality of life and economic vibrancy the plan proposes to “ [d]evelop [a] strategy and action plan for transportation including [strategies for] pedestrian & bike”. Nine projects (Table 4) and six master projects (twenty-one sub projects) (Appendix E) are identified in the project study area as scheduled for capital improvements in this fiscal cycle.

Table 4. CIP Projects in the South County Study Area

Project Title

Project Number

Project Description

19 th Avenue NE Widening - US 41 to US 301

C69640000 Widening of 19 th Avenue NE, a 2-lane undivided road, from US 41 to US 301 to 4-lanes including enhanced pedestrian, bicycle and bus facilities. C69633000 This project includes design, permitting, and construction for replacement of the 2 nd Street SE bridge #104317 over Ruskin Inlet. C69643000 Completion of a new 4-lane divided County road including an overpass over interstate 75 to provide connectivity between US 41 and US 301. C61149000 This PD&E study will determine the need to provide two additional lanes of capacity to Big Bend Road (CR 672) by widening the road from 4-lane divided arterial to a 6-lane divided arterial. The project limits are from Covington Garden Drive to Simmons Loop for 1.25 miles. The cost will be split between the developer and Hillsborough County because a portion of the project is outside the limits of the developer's project. C69647000 Widening of Big Bend Road, a 4-lane divided road, from US 41 to I-75 to 6- lanes including enhanced pedestrian, bicycle and bus facilities. C69656000 Improvements to I-75 interchange at Big Bend Road including extending the southbound off-ramp 1,200 feet, adding a left turn lane to make triple lefts, eliminating the free flow ramp for drivers turning right (eastbound) onto Big Bend Road, and adding two signal controlled right turn lanes at the ramp terminus. C69657000 Widening of Bid Bend Road, a 4-lane divided road, from Covington Garden Drive to Simmons Loop to 6-lanes including enhanced pedestrian, bicycle and bus facilities. C69648000 Improvements to I-75 interchange at Big Bend Road including realigning the westbound to northbound on- ramp and southbound to westbound off-ramp.

2 nd Street Bridge Replacement

Apollo Beach Blvd I-75 Overpass

Big Bend Road Widening (Simmons Loop to US 301)

Big Bend Rd Widening (US41 to Covington Garden Dr) Big Bend/I-75 Interchange Improvements Phase 1A

Big Bend/I-75 Interchange Improvements Phase 1B

Big Bend/I-75 Interchange Improvements Phase 2

48

Made with FlippingBook Learn more on our blog