Sun City Center Pedestrian Mobility Master Plan
C69639000 New and enhanced golf cart paths and pedestrian facilities within Sun City Center
Bridge and Guardrail Rehabilitation and Repair
C62120000 Rehab and repair of several County bridges, and rehab and repair of guardrail within County ROW. Scope includes rehab/repair of substructure, pre-stressed concrete deck spans, pile jackets and scour mitigation efforts, in addition to repairing and replacing guardrail as required. C69200000 Provision for CIT funds allocated to the Bridge program that have not yet been allocated to specific bridge projects. C69600000 Funding for a group of Intersection projects throughout Hillsborough County as shown in the annual prioritized Intersection Program Master Plan. C69645000 Countywide operation and safety improvements to the roadway system through intersection and access
Community Investment Tax (CIT) Funded Bridge Improvements Intersection Improvement Program Intersection Operation and Safety Enhancement Program
enhancements in high crash and high congestion locations. Projects include new, additional and lengthened turn lanes, new and enhanced medians, new and enhanced traffic signals and signal alternatives, and various other access and vehicle progression improvements.
Pedestrian Safety and Mobility Enhancement Program
C69638000 Countywide pedestrian facility enhancements to improve safety and mobility for pedestrians and bicyclists in high safety and mobility need locations. Projects include sidewalks near schools, school safety circulation
enhancements, new sidewalks on county roads, new and enhanced pedestrian crossings, signs and pavement markings.
Roadway Pavement Preservation Program
C69631000 Annual pavement condition inspection, routine repairs, preventive maintenance treatments and road repaving projects necessary to maintain the County's roads in a safe and serviceable condition for the lowest cost to the community
Source: Hillsborough County Capital Improvements Program FY18-FY23
Table 5 identifies Development of Regional Impact (DRI) capital projects managed by private sector on major roadways. Completion dates are estimates because they are subject to the timing of development. The Master Development Plan for the three (3) DRIs listed below can be seen in Appendix F.
49