South County Integrated Mobility Study

FDOT: Five-Year Work Program (FY19-FY23)

The FDOT Five Year Work Program for South County includes new interchanges, on/off ramps, road widening, and road resurfacing projects. The following facility projects are located within the South County area (Table 6):

Table 6. Adopted Five-Year Work Program Projects in South Hillsborough County Study Area

Project Name

Description

Alafia St & Vern St from Nundy Ave to Gibsonton Dr (2018-2020)

Sidewalk

Apollo Beach Extension from US 41 to Paseo Al Mar Boulevard (2020-2021) New Road Construction

Big Bend Rd from E of Dickman Rd to W of Wyandotte Rd (2018-2019)

Bridge Replacement

Gibsonton Dr EB from NB on Ramp to I-75 (2020-2022)

Add turn lanes

I-75 from S of Big Bend Rd to S of Progress Blvd (2018-2019)

ITS freeway management

I-75 @ Big Bend Rd New NB & SB ramps (2018-2019)

Interchange ramp (new)

I-75 @ Big Bend Rd SB Off ramp (2018-2021)

Interchange improvement

I-75 NB on ramp from NB US 301 to I-75 NB (2018-2019)

Interchange ramp

I-75 from Manatee County Line to N of CR 672 (2019-2020)

Resurfacing 6 lanes

I-75 from N of CR 672 to S of Progress Blvd (2018-2021)

Resurfacing 6 lanes

I-75 over Riverview Drive (2021-2023)

Bridge repair/rehab

Old Big Bend Rd from West of Bullfrog Creek to East of Bullfrog Creek (2018-2019) South Coast County Greenway from Apollo Beach to Sun City Center (2018- 2019)

Bridge replacement

PD&E/EMO Study

SR 674 from US 41 to E of College Chase Dr (2019-2020)

Resurfacing 6 lanes

US 301 at Riverview Dr (2019-2020)

Traffic signal update

US 301 from Lake St Charles Blvd to N of Progress Blvd (2018-2021)

Resurfacing 6 lanes

US 41 at Gibsonton Drive (2018-2021)

Traffic signal update

US 41 over Alafia River Long Bridge Repair (2019-2021)

Bridge repair/rehab

Port Tampa Bay - Big Bend Channel Improvements

Seaport capacity project

Source: FDOT Adopted Five Year Work Program FY19-FY23

51

Made with FlippingBook Learn more on our blog